15
m
o
d
e
l
1
8
0
0
0
re
p
li
c
a
load line reeving
Upon completion of reeving,
run wire rope over sheave at
top of luffing jib, over 2
sheaves in main and luffing
struts. Continue over the top
sheave on lower boom butt,
directly into main load drum.
(drum #1 on page 19).