FU-26 FUEL SYSTEM - Injection Nozzles (1 HD-T)
INSTALLATION OF INJECTION NOZZLES
(See page FU-17)
1. INSTALL INJECTION NOZZLES
(a) Install a new O-ring to the injection nozzle.
(b) Install new nozzle seats into the injection nozzle hole
of the cylinder head.
(c) Install the injection nozzles with the washer, nozzle
holder clamp and bolt.
Torque: 400 kg-cm (29 ft-lb, 39 N-m)
2. INSTALL NOZZLE LEAKAGE PIPE
(a) Install new gaskets and the leakage pipe with the
hollow bolts.
Torque: 125 kg-cm (9 ft-lb, 12 N-m)
(b) Connect the fuel hose to the return pipe.
3. CONNECT INJECTION PIPES
Connect the injection pipes to injection nozzle.
Torque: 250 kg-cm (18 ft-lb, 25 N-m)
4. INSTALL INTAKE PIPE
(See step 3 on page EM-38)
5. START ENGINE AND CHECK FOR FUEL LEAKS
Summary of Contents for 1HD-T
Page 1: ......
Page 53: ...EM 42 ENGINE MECHANICAL Timing Gears TIMING GEARS COMPONENTS ...
Page 65: ...EM 54 ENGINE MECHANICAL Cylinder Head CYLINDER HEAD COMPONENTS ...
Page 95: ...EM 84 ENGINE MECHANICAL Cylinder Block CYLINDER BLOCK COMPONENTS ...
Page 133: ...TURBOCHARGER SYSTEM Turbocharger TC 9 COMPONENTS ...
Page 145: ...FU 6 FUEL SYSTEM Fuel Heater System FUEL HEATER SYSTEM SYSTEM CIRCUIT ...
Page 166: ...FUEL SYSTEM Injection Pump FU 27 INJECTION PUMP REMOVAL OF INJECTION PUMP ...
Page 169: ...FU 30 FUEL SYSTEM Injection Pump COMPONENTS ...
Page 170: ...FUEL SYSTEM Injection Pump FU 31 COMPONENTS Cont d ...
Page 171: ...FU 32 FUEL SYSTEM Injection Pump COMPONENTS Cont d ...
Page 251: ...LU 4 LUBRICATION SYSTEM Troubleshooting TROUBLESHOOTING ...
Page 255: ...LU 8 LUBRICATION SYSTEM Oil Pump OIL PUMP COMPONENT ...
Page 272: ...ST 4 STARTING SYSTEM Pre Heating System Super Glow Type TIMER CHARACTERISTIC DIAGRAM Cont d ...
Page 282: ...ST 14 STARTING SYSTEM Starting System Circuit STARTING SYSTEM CIRCUIT Cont d ...
Page 340: ...B 1 STANDARD BOLT TORQUE SPECIFICATIONS Page STANDARD BOLT TORQUE SPECIFICATIONS B 2 ...
Page 343: ...C 1 SSTAND SSM Page SST SPECIAL SERVICE TOOLS C 2 SSM SPECIAL SERVICE MATERIALS C 6 ...