A01399
Dot Mark
Z15491
Seal Packing
EM--58
--
ENGINE MECHANICAL
CYLINDER H EAD (2RZ -- FE)
9 . CHE CK VALV E T I MI NG
(a)
Turn the crankshaft pulley, and align its groove with the
timing mark ”0” of the timing chain cover.
NOTICE:
Always turn the crankshaft clockwise.
(b)
Check that the timing marks (1 and 2 dots) of the camshaft
drive and driven gears are in straight line on the cylinder
head surface as shown in the illustration.
If not, turn the crankshaft 1 revolution (360
˚
) and align the
marks as above.
1 0 . CHE CK AND ADJ US T VALV E CLE ARANCE
Valve clearance (Cold):
Intake
0.15 -- 0.25 mm (0.006 -- 0.010 in.)
Exhaust
0.25 -- 0.35 mm (0.010 -- 0.014 in.)
11 . I NS TALL S E MI -- CI RCULAR P L UG S
(a)
Remove any old packing (FIPG) material.
(b)
Apply seal packing to the cylinder head installation sur-
face of the semi--circular plugs.
Seal packing:
Part No. 08826--00080 or equivalent
(c)
Install the semi--circular plug to the cylinder head.
12. INSTALL CYLINDER HEAD COVER
1 3 . I NS TALL E NG I NE WI RE BRACKE TS
1 4 . I NS TALL S PARK P L UG S
15. INSTALL CYLINDER HEAD REAR COVER
Install a new gasket and the rear cover with the 3 bolts.
Torque: 13.5 N
∙
m (135 kgf
∙
cm, 10 ft
∙
lbf)
16. INSTALL WATER OUTLET
(a)
Install a new gasket and the water outlet with the 2 bolts.
Torque: 20 N
∙
m (200 kgf
∙
cm, 14 ft
∙
lbf)
1 7 . I NS TALL E X HAUS T MANI FO LD
(a)
Install a new gasket and the exhaust manifold with the 6
nuts.
Torque: 49 N
∙
m (500 kgf
∙
cm, 36 ft
∙
lbf)
(b)
Install the heat insulator with the 2 bolts and 2 nuts.
Torque: 5.5 N
∙
m (55 kgf
∙
cm, 48 in.
∙
lbf)
1 8 . I NS TALL I NTAKE MANI FO LD
Install a new gasket and the intake manifold with the 3 bolts and
2 nuts.
Torque: 29 N
∙
m (300 kgf
∙
cm, 22 ft
∙
lbf)
CLICK HERE TO VIEW CHAPTER INDEX
Pages From Supplement
3RZ-F,3RZ-FE