A01397
New O--Ring
New Spacer
P15878
A
B
A
B
--
ENGINE MECHANICAL
CYLINDER HEAD (2RZ--FE)
EM--59
1 9 . I NS TALL I NJ E CTO RS AND DE LI V E RY P I P E
HINT:
When using a new cylinder head, spacers must be installed.
Apply a light coat of gasoline to a new O--ring and install it to a
new spacer.
20. INSTALL FUEL RETURN PIPE
Torque:8.8 N
∙
m (90 kgf
∙
cm, 78 in
∙
lbf)
21. INSTALL FUEL INLET PIPE
2 2 . I NS TALL AI R I NTAKE CHAMBE R A SSEMBLY
(a)
Install a new gasket and the air intake chamber assembly
with the 3 bolts and 2 nuts.
Torque:21 N
∙
m (210 kgf
∙
cm, 15 ft
∙
lbf)
(b)
Connect these hoses:
S
EVAP hose to throttle body
S
Brake booster vacuum hose to union
S
Water bypass hose to water bypass pipe
S
Water bypass hose to cylinder head rear cover
2 3 . I NS TALL I NTAKE CHAMBE R S TAY
Torque:20 N
∙
m (200 kgf
∙
cm, 15 ft
∙
lbf)
24. INSTALL EGR PIPE
Install 2 new gaskets and EGR pipe with the bolt and 4 nuts.
Torque:
Bolt: 18 N
∙
m (185 kgf
∙
cm, 13 ft
∙
lbf)
Nut A: 19 N
∙
m (195 kgf
∙
cm, 14 ft
∙
lbf)
Nut B: 20 N
∙
m (200 kgf
∙
cm, 15 ft
∙
lbf)
2 5 . CO NNE CT I NJ E CTO R CO NNE CTO RS
2 6 . CO NNE CT E NG I NE WI RE
27. INSTALL IGNITION COILS
2 8 . I NS TALL P CV HO S E S
2 9 . FI LL WI TH E NG I NE CO O LANT
3 0 . S TART E NG I NE AND CHE CK FO R L E AKS
31. VEHICLE ROAD TEST
Check for abnormal noise, shock, slippage, correct shift points
and smooth operation.
32. RECHECK ENGINE COOLANT LEVEL
CLICK HERE TO VIEW CHAPTER INDEX
Pages From Supplement
3RZ-F,3RZ-FE