1-27
Installation Procedure
The installation procedure is the reverse of the removal procedure.
Note:
• After installation, bleed air from the fuel system.
• Prepare an oil receiver since the hydraulic oil will run out when the piping is disconnected.
Caution:
At the time of maintenance, inspection, adjustment or replacement of the torque converter ASSY,
remove the parking brake air chamber before disconnecting the battery
terminal.
Point Operations
[Point 1]
Removal
•
Installation:
Disconnect the piping to make the material handling pump
as illustrated at left.
[Point 2]
Removal
•
Installation:
Hoisting
Caution:
Do not remove the torque converter level gage piping
but fix it on the engine side.
[Point 3]
Removal
•
Installation:
Remove the lower nuts on both the engine and torque
converter sides for easy positioning at the time of
reinstallation on the vehicle.
Position
Weight
Center of gravity
Engine side
:2 places
Torque converter side
:1 place
Approx.
1,200 kg
(2645 lb)
Above the con-
tact surface
between the
engine and
torque converter