[P
[Point
oint 5]
5]
Reassembly:
Reassembly:
After
After clamping
clamping shift
shift lever
lever cables
cables under
under the
the differential,
differential, lead
lead
the
them
m to the shif
to the shift
t lev
lever side
er side by
by cro
crossi
ssing
ng wi
with
th the
the
FFIR
IR
cable
cable
on th
on the
e fro
front
nt sid
side.
e.
*
*0
00
0
not cross the TCM
not cross the TCM arran
arrangemen
gement.
t.
2-10
2-10
DI
DISASS
SASSEMBLY-
EMBLY-IINSP
NSPECT
ECTIION
ON
-RE
-REASSE
ASSEMBLY
MBLY
T
T
=
=
N·
N·m
m ((kgf-cm )
kgf-cm ) [ft-
[ft-Ibf
Ibf]]
T=14.7-21.6
T=14.7-21.6
(150-220)
(150-220)
8
8
T=14.7-21.6
T=14.7-21.6
(150-220)
(150-220)
T
T =
=2
29
9..4
4--3
39
9..2
2
~
~
((3
30
00
0--4
40
00
0)
)
""------
-
-
I
I
[[2
21
1. 7
. 7--2
28
8..9
9]]~
~
T =
T =1
17
7..5
5--3
32
2..5
5
Y
Yl
l
11
(178.4-331.4)
(178.4-331.4)
rr
rr
9
9
[1
[12.
2.9-
9-24
24.0
.0]]
~
~ c
c
https://www.besttruckmanuals.com/