background image

 

 

1 Product Introduction 

1.1  Brief Introduction 

TP-Link presents the industry's leading GPON solution of P1200-08, which complies with the 
relevant standards of ITU G.984.x and FSAN. P1200-08 is 1U Rack mount equipment, 8pon 
ports, 8 GE uplink optic ports, 8 GE uplink electric ports. The maximum optical coupling ratio 
of 1:128, up to 1024 GPON ONTs. The down link band width is 2.5Gbps and uplink bandwidth 
is  1.25Gbps.  The  product  is  in  compact  design  and  convenient  for  flexible  using,  easy  to 
deploy with high performance. It can meet the requirements of equipment performance and 
compact volume of the room environment. It can also satisfy the requirements of the access 
network and enterprise network that enhancing the network function, improving the reliability 
and  reducing  power  consumption.  The  product  is  suitable  for  the  "triple  play"  service,  the 
resident  of  optical  access  network,  video  surveillance  network,  enterprise  network  and  the 
Internet of the network applications. 

 

Figure 1-1 P1200-08 in GPON system 

1.2  Functional Features 

Comply  with  ITU-T  G.984/G.988  standards  and  China's  Telecom  industry  GPON 
standards. 

Support  OMCI  remote  management  of  ONT/ONT,  compatible  with  ITU-984.4  OMCI 
protocol. 

Standalone 1U 8PON compact design of OLT products 

P1200-08 provides 8 GPON ports, 8 uplink GE optical ports + 8 uplink GE electric ports, 10 
Gigabit card expansion slot provides 2*10Gigabit SFP+ uplink port. Each PON port supports 
128 ONT, total 1024 ONT for one chassis. Support dual power supply redundancy, 220VAC 
and -48VDC mixed. 

The complete layer 2 switching function 

OLT is with powerful layer 2 switching capacity and complete layer 2 protocol. Supporting with 
the exchange, isolation and One By One working mode. Supporting port aggregation, VLAN, 
port  speed,  queue  technology,  flow  control  technology  and  ACL  rich  two  layer  function. 
Offering the technical support for the development of the multi-service fusion. 

The QOS security 

GPON  products  is  with  complete  DBA  function  and  excellent  ability  of  QoS  service.  DBA 
provides a variety of QoS for the GPON system by means of four types of bandwidth and five 

Summary of Contents for P1200-08

Page 1: ...Installation User Guide GPON OLT P1200 08 Version V1 0...

Page 2: ...s are trademarks or registered trademarks of their respective holders No part of the specifications may be reproduced in any form or by any means or used to make any derivative such as translation tra...

Page 3: ...n 5 3 3 1 Plane stack installation 5 3 3 2 Rack Installation 5 3 4 Port and Connection 6 3 4 1 Uplink Port 6 3 4 2 PON Port Connection 7 3 4 3 Ground Cable Connection 8 3 4 4 Management Port Connectio...

Page 4: ...he network applications Figure 1 1 P1200 08 in GPON system 1 2 Functional Features Comply with ITU T G 984 G 988 standards and China s Telecom industry GPON standards Support OMCI remote management of...

Page 5: ...ace The P1200 08 1U high Pizza Box can be mounted into the standard 19 rack Demission of machine frame 440mm L 391mm W 44mm H As shown below Figure 1 2 Front View of P1200 08 See the following table I...

Page 6: ...link with the OLT port n GE n n 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Flash There is the communication data at the uplink port n Green Always ON The uplink port n is connected OFF The uplink port n i...

Page 7: ...mperature is 0 C 40 C To ensure that equipment works in the normal temperature environment 25 C or so should try to make the equipment away from the main heat source such as power supply etc if the en...

Page 8: ...ent need connect the following equipment with OLT A management platform such as PC RJ45 DB9 RS232 Console line 3 3 OLT Installation OLT can be put in the bigger horizontal surface or within the standa...

Page 9: ...the cabinet Step IV Use screws to fix the suspension loops of the cabinet to the square holes of the 19 inch cabinet column and to fix the OLT device to the cabinet 3 4 Port and Connection The chapte...

Page 10: ...k connection Cable with RJ45 connectors at both sides Cable with LC connector at both sides Decide the port type of OLT according to the port type of the uplink device Switch or Route 3 4 1 3 Method o...

Page 11: ...t access marked as MGMT RJ45 type port Console access is really only required when initially configuring a device or if remote access fails Console access requires Console cable RJ 45 to DB 9 console...

Page 12: ...y unit Additionally to ensure true AC line input redundancy for the OLT you should connect each AC power cable to a different AC power source You can also connect an uninterruptible power supply UPS b...

Page 13: ...DC input power cable 3 5 OLT working status checkout 3 5 1 Check out power supply Before you connect the power supply double check the power supply if it is accord with the power supply requirements I...

Page 14: ...sword admin 5 Appendix OLT Specification Item Specification Chassis Rack 1U 19 inch standard box Slots 1 10 Gigabit uplink card slot 2 power module slot Uplink Port Copper 8 10 100 1000M auto negotiab...

Page 15: ...tate monitoring configuration management equipment log equipment upgrades equipment management user management Layer 2 switch configuration such as Vlan Trunk RSTP IGMP QOS etc PON management function...

Reviews: