Front Panel

 

Figure 3-1 Rack installation 

The installation process is as follows: 

Step I: Pre-Installation Validation 

 

Ensure the cabinet is fixed and the installation location of the OLT device in the cabinet is well 

arranged, and no obstacles inside the cabinet and the surroundings affecting the installation 
of the device exist. 

 

Prepare  the  OLT  device  to  be  installed  and  move  the  device  to  the  place  where  is  near  the 

cabinet and facilitates the handling. 

Step II: Lift the OLT device and slowly move the device to the front of the cabinet. 

Step III: Lift the OLT device to the location slightly higher than the tray or sideway of the cabinet, 
place the OLT device to the tray or sideway of the cabinet and then push it to the cabinet. 

Step IV. Use screws to fix the suspension loops of the cabinet to the square holes of the 19-inch 
cabinet column and to fix the OLT device to the cabinet. 

3.4  Port and Connection 

The  chapter  describes  the  port  and  power  supply  connection  situation  in  OLT  system,  mainly 
include the following parts: 

 

Uplink Port 

 

PON Port Connection 

 

Ground Cable Connection 

 

Management Port Connection  

Please carefully read the following introduction before connecting each port of OLT: 

3.4.1 Uplink Port 

3.4.1.1  Port Explanation 

OLT offers eight GE electrical port, eight GE SFP optical port and two 10 Gigabit port for uplink. 
Electrical port and optical port can combination at the sometime, you can use direct-through, cross 
cable or fiber connection of the OLT and uplink equipment. 

SFP module can be the optical module or the electrical module, and follow standards below: 

 

1000Base-LX (Long wave length) 

 

1000Base-SX (Short wave length) 

Summary of Contents for P1200-08

Page 1: ...Installation User Guide GPON OLT P1200 08 Version V1 0...

Page 2: ...s are trademarks or registered trademarks of their respective holders No part of the specifications may be reproduced in any form or by any means or used to make any derivative such as translation tra...

Page 3: ...n 5 3 3 1 Plane stack installation 5 3 3 2 Rack Installation 5 3 4 Port and Connection 6 3 4 1 Uplink Port 6 3 4 2 PON Port Connection 7 3 4 3 Ground Cable Connection 8 3 4 4 Management Port Connectio...

Page 4: ...he network applications Figure 1 1 P1200 08 in GPON system 1 2 Functional Features Comply with ITU T G 984 G 988 standards and China s Telecom industry GPON standards Support OMCI remote management of...

Page 5: ...ace The P1200 08 1U high Pizza Box can be mounted into the standard 19 rack Demission of machine frame 440mm L 391mm W 44mm H As shown below Figure 1 2 Front View of P1200 08 See the following table I...

Page 6: ...link with the OLT port n GE n n 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Flash There is the communication data at the uplink port n Green Always ON The uplink port n is connected OFF The uplink port n i...

Page 7: ...mperature is 0 C 40 C To ensure that equipment works in the normal temperature environment 25 C or so should try to make the equipment away from the main heat source such as power supply etc if the en...

Page 8: ...ent need connect the following equipment with OLT A management platform such as PC RJ45 DB9 RS232 Console line 3 3 OLT Installation OLT can be put in the bigger horizontal surface or within the standa...

Page 9: ...the cabinet Step IV Use screws to fix the suspension loops of the cabinet to the square holes of the 19 inch cabinet column and to fix the OLT device to the cabinet 3 4 Port and Connection The chapte...

Page 10: ...k connection Cable with RJ45 connectors at both sides Cable with LC connector at both sides Decide the port type of OLT according to the port type of the uplink device Switch or Route 3 4 1 3 Method o...

Page 11: ...t access marked as MGMT RJ45 type port Console access is really only required when initially configuring a device or if remote access fails Console access requires Console cable RJ 45 to DB 9 console...

Page 12: ...y unit Additionally to ensure true AC line input redundancy for the OLT you should connect each AC power cable to a different AC power source You can also connect an uninterruptible power supply UPS b...

Page 13: ...DC input power cable 3 5 OLT working status checkout 3 5 1 Check out power supply Before you connect the power supply double check the power supply if it is accord with the power supply requirements I...

Page 14: ...sword admin 5 Appendix OLT Specification Item Specification Chassis Rack 1U 19 inch standard box Slots 1 10 Gigabit uplink card slot 2 power module slot Uplink Port Copper 8 10 100 1000M auto negotiab...

Page 15: ...tate monitoring configuration management equipment log equipment upgrades equipment management user management Layer 2 switch configuration such as Vlan Trunk RSTP IGMP QOS etc PON management function...

Reviews: