11
Gigabit Smart Switch
Rack
Rack Installation
Figure 2-3
Caution:
Please set 5~10cm gaps around the device for air circulation.
■
Please avoid any heavy thing placed on the device.
■
Please mount devices in sequence from the bottom to top of the rack and ensure a
■
certain clearance between devices for the purpose of heat dissipation.
Installation