Printed in the Federal Republic of Germany
TR-Electronic GmbH 2011, All Rights Reserved
02/03/2016
TR - ECE - BA - DGB - 0089 - 04
Page 75 of 131
2.2 Additional instructions for proper use
The measurement system is designed for operation with PROFIBUS-DP networks
according to the European standards EN 50170 and EN 50254 up to max. 12 Mbaud.
The parameterization and the device diagnosis are performed through the PROFIBUS
master according to the profile for encoders version 1.1 of the PROFIBUS User
Organization (PNO).
The technical guidelines for the structure of the PROFIBUS-DP network from the
PROFIBUS User Organization are always to be observed in order to ensure safe
operation.
Proper use also includes:
observing all instructions in this manual,
observing the operating instruction. The "Safety instructions" in particular
must be read and understood prior to commencing work.
2.3 Organizational measures
This manual must always kept accessible at the site of operation of the
measurement system.
Prior to commencing work, personnel working with the measurement system
must have read and understood
-
the operating instruction, in particular the chapter
"Safety instructions"
,
-
and this manual, in particular the chapter "Additional safety instructions".
This particularly applies for personnel who are only deployed occasionally,
e.g. at the parameterization of the measurement system.