6.3 Transport Loading / Unloading procedure
1.
Load the machine only on firm and level ground.
2.
Before driving onto the ramps, clean them and the machine
tracks of any materials that may cause slippage (snow, ice,
sludge, etc.).
3.
Properly align the machine with the loading ramp.
4.
Have a guide give the machine operator any necessary signs
to maximize safety during loading.
5.
Move carefully onto the ramps and transport vehicle.
6.
Have a guide instruct you as to where and when to stop and
park the machine. Lower the lift arms and turn off the engine.
7.
Before securing the machine, relieve all residual pressure by
making sure the operating levers and the auxiliary hydraulic
switch are in their neutral positions. Remove the ignition key.
8.
Secure the door, windows and hood on the machine.
9.
Secure the machine and any other items to the transport
vehicle with chains or ropes of the proper capacity.
10. Before departure, investigate the route to be taken, especially
in regard to limits for width, height and weight.
11. Pay close attention when driving under electrical lines, bridges,
or through tunnels.
12. To unload, reverse steps 1-9 of this procedure. Use the same
caution when unloading as for loading. Remove all cables or
chains. Start the engine as described in the operating
instructions. Carefully drive down the ramp from the transport
vehicle using a guide if necessary to direct movement.
6 TRANSPORTATION
59
Electrocution hazard exists if electrical lines are contacted!
Stay clear of electrical lines!
Summary of Contents for Terex PT30CE
Page 7: ...6...
Page 31: ...30...
Page 33: ...32...
Page 39: ...38...
Page 47: ...46...
Page 57: ...56...
Page 63: ...62...
Page 82: ...Hours Service Performed Notes SERVICE LOG 81...
Page 83: ...Hours Service Performed Notes SERVICE LOG 82...