background image

TRAK Machine Tools

 

Site Preparation Guide 
TRAK VMC7si  

                                                                                                                                           

F16467-62 | Rev 8/3/2021 

Page 1 of 7 

Before an Authorized Field Service Technician can perform the machine’s final checkout, the following requirements must 

be met:

 

 

The machine must be in position and placed on its rest 
pads. 

 

Please make sure to use a large enough forklift when 
lifting the VMCsi machine.  When removing the machine 
from the pallet, please note that the center of gravity 

(CG) of the machine is ~56” from the edge of the 

enclosure sheet metal.  See figure 4.     

 

The VMCsi must be lifted from either the left or right 
hand sides. Make certain that the forks are squarely in 
the lifting cutouts beneath the machine. See the figures 
below. 

 

The VMCsi may be lifted via a crane with 4 points shown 
in figure 7 and 8.   

 

 

Once the machine is raised from the pallet, thread the 
adjusting screws into the bed casting. Thread the leveling 

screws down approximately 1.25” as measured from the 

bottom of the leveling bolt to the bottom of the casting. 
The VMCsi should be placed on the 4 leveling pads labeled 

L1, R1, L3 and R3. See figure 6. The leveling screws labeled 
L2 and R2 should be threaded in but not touching the pad. 
They will be adjusted during installation.  

 

The machine must be wired (refer to the installation and 
service manual for additional information). Make sure to 
follow our grounding recommendations.   

 

The machine must have air hooked up. We strongly 

recommend that a water separator or air dryer be installed 
upstream of the VMCsi air supply. 

 

Space & Weight 

 

Floor area (W x L) = 177” x 128.25”

 

 

Height = 93.5” (min) / 108” (max)

 

 

Footprint (W x L) (coolant tank in place) = 144” x 112”

 

 

Net (approx.) Weight = 8,360 lbs. 

 

Shipping (approx.) Weight = 8,710 lbs. 

 

Pallet Size = 91

” x 10

4

 

 

The floor area encompasses the space required to 

position the chip container and have the electrical 
cabinet or side doors open along the X axis. 

 

A solid and level foundation to maintain approximately 

8,360 lbs. plus the weight of the workpiece (maximum 
total of ~ 10,000 lbs.) is required. Six leveling screws are 
provided. 

 

Minimum doorway width is 90” and minimum height is 

93.5” that the VMCsi can f

it through (assumes Z cable 

carrier collapsed and Z axis motor removed). The 93.5” 
height dimension can be reduced to 88.25” if further 

items are removed. (Must remove ATC motors and all 
sheet metal attached to top of electrical cabinet. The 

cable way for Z axis also needs to be removed. The 
lifting point on the electrical cabinet is now the highest 
point.) 

Electrical 

 

A separate 480 VAC (432 to 528 V is acceptable), 41 amps, 
60 Hz, 3 phase circuit is required.   

 

A separate 208 VAC (200 to 240 V is acceptable), 94 amps, 
60 Hz, 3 phase circuit is required.  

 

A transformer is required for 208V. TMT provides this as an 
option.  

 

Machine tool should be earth grounded with a dedicated 8-

foot long copper rod. The 6-gage ground wire should run 
from the copper rod to grounding location in the electrical 
cabinet. See figures 9 and 10.     

Air  

 

½” ID minimum air connection is required.

 

 

Air pressure must be a minimum of 90 psi. 

 

Air 

 2.5 CFM (at 90 psi), 18 SCFM

 

 
 

 
 

Reviews: