background image

Trane
6200 Troup Highway
Tyler, TX 75707
www.trane.com

For more information contact
your local dealer (distributor)

The manufacturer has a policy of continuous product and product data improvement, and it reserves the
right to change design and specifications without notice.

04/09

SUPPLEMENTARY HEATERS CHECKOUT PROCEDURES,

IF USED DOES HEATER REQUIRE A SPECIAL CIRCUIT?

SEE “LIMITATIONS AND RECOMMENDATIONS”

1. Be sure the disconnect switch is “OFF”, and safety label (if any) is attached ........................................... [

]

2. Check on field wiring for tight connections and grounding according to codes ........................................ [

]

3. Check circuit protection for proper size per nameplate specifications ..................................................... [

]

4. Check control box panel — in place and secured ....................................................................................... [

]

NOTE: OPERATION OF HEATERS MUST BE CHECKED DURING THE OPERATION CHECK OF THE TOTAL
SYSTEM.

CHECKOUT PROCEDURES

After installation has been completed, it is recommended that the Air Handler be checked against the follow-
ing checklist.

1. Make sure power is “OFF” at power

disconnect switch ................................................. [ ]

2. Check all field wiring for tight connections. See

that grounding of unit is in accord with code ..... [ ]

3. Make sure unit suspension (if used) is secure

and that there are no tools or loose debris in,
around or on top of the unit ................................ [ ]

4. Check all duct outlets; they must be open

and unrestricted .................................................. [ ]

5. Check drain lines and be sure all joints are tight

............................................................................. [ ]

6. Make sure secondary drain pan is installed ....... [

]

7. Check power supply for correct requirements

per unit nameplate .............................................. [

]

8. Check filters for proper size. Inform owner

of proper procedure for removal and
reinstallation ....................................................... [

]

9. Energize the system and carefully observe its

operation; make any necessary adjustment ....... [

]

10. Instruct owner, engineer (if possible) on proper

operating procedure and leave Use and Care
Manual with owner ............................................. [

]

Installer’s Guide

J. CHECKOUT PROCEDURE

1. Check the Air Handler operation and installation in

accordance with these instructions below.

2. “Operational Procedure” for the system installation

can be found in the outdoor unit installer guide and
will be compatible with this Air Handler.

CAUTION

!

Cardboard packing material must be removed from in-
side the blower assembly before starting the unit.
Failure to do so may cause indoor blower motor fail-
ure.

WARNING

!

TO PREVENT INJURY OR DEATH DUE TO ELECTRICAL 
SHOCK OR CONTACT WITH MOVING PARTS, LOCK 
UNIT DISCONNECT SWITCH IN OPEN POSITION 
BEFORE SERVICING UNIT.

Summary of Contents for 2/4TEH3F18B1000A

Page 1: ...s do not cover all variations in systems or provide for every possible contingency Should fur ther information be desired or particular problems arise which are not covered sufficiently by this manual con tact your local distributor or the manufacturer as listed on the air handler nameplate These air handlers are shipped from the factory in the upflow or horizontal right configuration and are full...

Page 2: ...if the minimum clearances to combustible materials and service access are observed the above installations are suitable This area may also be used for other purposes includ ing an electric hot water heater but in no case shall a fossil fuel device be installed and or operated in the same closet alcove or utility room In addition these air handlers are suitable for installa tion in an attic garage ...

Page 3: ... width requirements must be considered in the overall space needed 17 These units are not approved for outdoor installa tion 18 These units are approved for draw through appli cation only NOTE No atomizing style humidifier is allowed in the return plenum with the use of this unit 19 Flow through Bypass Humidifiers Excessive bypass air may cause water blow off which will adversely affect system ope...

Page 4: ... as shown in the outline drawing e On units with sheetmetal returns Return ple num should be flanged Sheetmetal screws must be 1 2 in length or shorter f No sheetmetal screws may be used to attach re turn duct work on the side of the unit g Pedestal and unit should be isolated from the foundation using a suitable isolating material h Openings where field wiring enters the cabinet must be completel...

Page 5: ...ll the baffle to coil with gasket material compressed against the coil f Install the water blow off baffles provided on each side of the coil with the flange at the top as shown in Figure 9 The bottom of the baffle is to be as close to the bottom of the coil as possible g Install the 7 8 wide gasket in each side of the drain pan as shown in Figure 9 h Place the 2 water diverter baffles 5 ton model...

Page 6: ...should not ex ceed the face velocity of the filter being used The factory installed filter should then be removed from the unit Remove the factory installed baffle assembly from the apex of the coil by using a 5 16 nutdriver to remove the hex head screws Replace this baffle with the factory supplied narrow coil baffle using the screws re moved previously See Figure 5 CAUTION When installing the na...

Page 7: ...revent sagging The service access must remain unobstructed If the unit is sup ported along the length of the front and back with rails the air handler only needs to be sus pended at both ends See Figure 10 with rails the air handler only needs to be sus pended at both ends See Figure 10 If the unit is not suspended it must be supported as mentioned above and isolated carefully to pre vent sound tr...

Page 8: ...prevent air leakage NOTE No sheetmetal screws may be used to attach re turn ductwork on the side NOTE On units with sheetmetal returns Return plenum should be flanged Sheetmetal screws must be 1 2 in length or shorter See Figure 12 NOTE If the convertible duct flanges are not used they must be removed and discarded for proper airflow NOTE Any duct board return connection can be made to the sides o...

Page 9: ...g fittings in the condensate drain lines 2 Field supplied tubing should be cut square round and free of burrs at the connecting end Clean the tubing to prevent contaminants from entering the system 3 Run refrigerant tubing into the stub sockets of in door unit coil 4 Braze and evacuate according to indoor and outdoor installation instructions 5 Seal around refrigerant lines PAINTED AREAS OF UNIT M...

Page 10: ...e as well as any other cabinet penetrations must be sealed air tight I CONTROL WIRING 1 Connect wiring between indoor unit outdoor unit and Comfort Control The use of color coded low voltage wires is recommended 2 Field wiring diagrams are provided which show the low voltage wiring hook up for a single speed cooling only system with supplementary heaters and a heat pump system with supplementary h...

Page 11: ...18 GE09D1 9 11 Installer s Guide 2 4TEH AIR HANDLER WITH HEAT PUMP WITH SUPPLEMENTAL HEAT From Dwg B801082 Rev 2 ...

Page 12: ...12 18 GE09D1 9 Installer s Guide 2 4TEH AIR HANDLERS WITH SINGLE SPEED COOLING UNIT 1 STAGE HEAT From Dwg B801083 Rev 2 ...

Page 13: ...18 GE09D1 9 13 Installer s Guide 2 4TEH AIR HANDLER WITH SINGLE SPEED COOLING UNIT 2 STAGE HEAT From Dwg B801081 Rev 2 ...

Page 14: ...14 18 GE09D1 9 Installer s Guide OUTLINE DRAWING FOR 2 4TEH3F18 60B ...

Page 15: ...R HANDLER DIMENSIONAL DATA MODEL H W 2 4TEH3F18B 43 00 21 50 2 4TEH3F24B 43 00 21 50 2 4TEH3F30B 45 00 21 50 2 4TEH3F36B 45 00 21 50 2 4TEH3F42B 51 75 23 50 2 4TEH3F48B 57 90 23 50 2 4TEH3F60B 57 90 23 50 2 4TEH3F48B 60B Are two piece cabinets ...

Page 16: ...th code 3 Make sure unit suspension if used is secure and that there are no tools or loose debris in around or on top of the unit 4 Check all duct outlets they must be open and unrestricted 5 Check drain lines and be sure all joints are tight 6 Make sure secondary drain pan is installed 7 Check power supply for correct requirements per unit nameplate 8 Check filters for proper size Inform owner of...

Reviews: