background image

18-AD41D1-1B-EN  

3

Installer’s Guide

Maximum airflow setting, CFM

Coil

Upflow Downflow

Horizontal 

Left

Horizontal 

Right

4PXC*U24BS3HAB

900

750

800

900

4PXC*U30BS3HAB 1125

925

1000

1125

4PXC*D30BS3HDB

n/a

n/a

4PXC*U32BS3HAB

1350

1200

1350

1350

4PXC*U36BS3HAB

1100

1200

4PXC*D36BS3HDB

n/a

n/a

4PXC*U42BS3HAB 1575

1300

1400

1575

4PXC*D42BS3HDB

n/a

n/a

4PXC*U48BS3HAB 1800

1475

1600

1800

4PXC*U60BS3HAB 2250

1850

2000

2250

4PXC*D60BS3HDB

n/a

n/a

* May be "A", "B", "C", or "D"

F. MAXIMUM AIRFLOW SETTING, CFM

NOTE:   

Water blow-off could occur in certain installation posi-

tions if the airflow setting exceeds the maximum values 

listed.

IMPORTANT:  

Do not unseal refrigerant tubing until ready to fit refrigerant 

lines.

There is only a holding charge of dry air in the indoor coil, therefore 
no loss of operating refrigerant charge occurs when the sealing 
plugs are removed.

G. INSTALLING / BRAZING REFRIGERANT LINES

Do NOT open refrigerant valve at the outdoor unit until the 

refrigerant lines and coil have been brazed, evacuated, and 

leak checked.  This would cause contamination of the refrig-

erant or possible discharge of refrigerant to the atmosphere.

1.  The following steps are to be considered when installing 

the refrigerant lines:

a. Determine the most practical way to run the lines.
b. Consider types of bends to be made and space 

limitations.

    c. Route the tubing making all required bends and 

        properly secure the tubing before making final 

        connections.

NOTE:

 Refrigerant lines must be isolated from the structure and 

the holes must be sealed weather tight after installation.

NOTE:   

The TXV setting on this unit may run high superheat  

(15-25°F) by design when measured at the outdoor unit.

Figure 4

Attach Downflow 

Bottom Gasket

Start 

here

Figure 5

Note: when installing coil onto an S-Series furnaces 

in horizontal right or downflow configuration, bend 

the flanges downward for a flush fit.

  a.  Lay the coil on its back side.
  b.  Locate the 4" wide gasket material found in 

        BAYGSKT001A0.
  c.    Attach  the  4"  gasket  material  to  three  sides  of  the  bottom                                                                                                                                           

        of  the  drain  pan  as  shown.  Make  sure  to  start  by  matching                                                                                                                                         

        up  the  edge  of  the  gasket  material  to  the  inner  edge  of  the                                                                                                                                              

    drain pan by the coil fins and working outwards.

  d.    The  gasket  material  can  be  cut  or  ripped  easily  so  that  it                                                                                                                                               

     can be tailored to fit. The gasket material must cover

         the three sides along the entire length of the coil as shown

         in Figure 4.

CAUTION

!

Summary of Contents for 4PXCAU24BS3HAB

Page 1: ... separately purchased kit Upflow models 4PXCAU24BS3HAB 4PXCAU32BS3HAB 4PXCBU24BS3HAB 4PXCBU30BS3HAB 4PXCCU30BS3HAB 4PXCBU36BS3HAB 4PXCCU36BS3HAB 4PXCBU42BS3HAB 4PXCCU42BS3HAB 4PXCBU48BS3HAB 4PXCCU48BS3HAB 4PXCDU48BS3HAB 4PXCCU60BS3HAB 4PXCDU60BS3HAB Downflow models 4PXCBD30BS3HDB 4PXCBD36BS3HDB 4PXCCD36BS3HDB 4PXCBD42BS3HDB 4PXCCD42BS3HDB 4PXCCD60BS3HDB 4PXCDD60BS3HDB NOTE OPTIONAL DOWNFLOW GASKET...

Page 2: ... coil is pressurized with 8 12 psig of dry air Do not stand directly in front of the coil connections when removing sealing plugs If no pressure is released check for leaks D FURNACE IN UPFLOW POSITION APPLICATION USES UPFLOW COIL MODELS ONLY IMPORTANT If installing the coil in the horizontal position you MUST use the horizontal kit listed below for this coil model num ber and follow the instructi...

Page 3: ...dischargeofrefrigeranttotheatmosphere 1 The following steps are to be considered when installing the refrigerant lines a Determine the most practical way to run the lines b Consider types of bends to be made and space limitations c Route the tubing making all required bends and properly secure the tubing before making final connections NOTE Refrigerant lines must be isolated from the structure and...

Page 4: ...g a strong water stream such as from a garden hose being careful to prevent fin damage Use chemical cleaners only when necessary Figure 6 Capillary tubes will come out the top of bulb when positioned correctly I CONDENSATE DRAIN PIPING Condensate drain connections are located in the drain pan at the bottom of the coil enclosure assembly The female threaded fitting protrudes outside of the enclosur...

Page 5: ...H C IN 13 5 8 13 5 8 16 5 8 16 5 8 20 1 8 16 5 8 20 1 8 23 5 8 20 1 8 23 5 8 TOP OPENING D 12 3 4 12 3 4 15 3 4 15 3 4 19 1 4 15 3 4 19 1 4 22 3 4 19 1 4 22 3 4 GAS CONNECTION 3 4 7 8 LIQUID CONNECTION 3 8 MATCHED FURNACE WIDTH NO ADAPTER RQUIRED 14 1 2 14 1 2 17 1 2 17 1 2 21 17 1 2 21 24 1 2 21 24 1 2 DRAIN PAN PLASTIC 4PXCCD36BS3 FIGURE A 42 17 5 8 17 1 2 16 5 8 15 3 4 3 4 17 1 2 4PXCCU30BS3 FI...

Page 6: ...6 18 AD41D1 1B EN Installer s Guide From Dwg D346711 RevB ...

Page 7: ... NO Is superheat 25F YES NO Is indoor temperature more than 85F NO Is sub cooling less than 8F YES Confirm that charge is correct and look for dirty or restricted outdoor coil Confirm that charge is correct NO Before starting insure the blower wheel indoor and outdoor coils are clean Is the liquid line temperature at indoor coil within 8F of outdoor liquid line temperature YES Verify line set is s...

Page 8: ...lications For more information please visit www trane com or www americanstandardair com The manufacturer has a policy of continuous data improvement and it reserves the right to change design and specifications without notice We are committed to using environmentally conscious print practices 2021 18 AD41D1 1B EN 27 Apr 2021 Supersedes 18 AD41D1 1A EN February 2021 ...