Figure 65:
Applying the sealing agent on the frontal joints
Figure 66:
Unit separation acces-
sible via door
Figure 67:
Sealing the section
connection (joint) with the sealing
agent
5.1.6 Cable gland
For the connection of engines, pumps, electric heaters, sensors, etc., TRANE loosely supplies ma-
terial for cable glands (
), which must be installed properly. The following procedure is
recommended:
1. Drilling through unit casing (at right angles to the surface).
2. Enlarge drillings on external panel and internal panel according to
Unit flange
Roof flange
Joint
Joints
Access (door)
Summary of Contents for CCEB