Providing Vertical Clearance
The vertical discharge of air from the
condenser should be unobstructed.
Though it is difficult to foresee the level of
hot air short circuiting, a unit installed as
shown above (first, to the right) would have
its capacity and efficiency significantly
reduced. The performance data is based
on the free discharge of air.
Providing Side Clearance
The entrance of the condenser coil should
not be obstructed. A unit installed closer
than the minimum distance
recommended for a wall or other vertical
elevation can undergo a combination of
lack of circulation of free air and warm air
recirculation, which would result in the
reduction of the unit's capacity and
efficiency. The recommended side
clearances are described in the section on
dimensional data. These are estimates
and should be reviewed with Trane's
engineer assigned to the site.
Providing enough Clearance between the
Equipment
The units should be separated one from
the other by a distance that is enough to
prevent short circuiting of hot air or lack of
circulation of free air through the coil. The
CGAD liquid chillers with air condensation
have one of the smallest clearances
recommended for equipment of its
category on the market. Check with Trane's
engineer assigned to your site for
applications dealing with tight clearances
and restricted air flows.
Installation in a Place Surrounded by
Walls
When the unit is installed in a place closed
in or with a small depression, the height of
the fans cannot be lower than the top of the
closed-in area or depression. If they are
lower, the installation of duct work at the top
of the unit should be considered. The
installation of duct work on individual fans,
however, is not recommended. These
applications should always be reviewed by
Trane's engineer assigned to the site.
Application
Considerations
Fig. 06 - Recommended clearances
Summary of Contents for CGAD020
Page 36: ...CGAD SVN02C EN 36 Wiring Diagram Fig 17 Power and command wiring diagram CGAD 020C Sheet 1 2...
Page 52: ...CGAD SVN02C EN 52 Wiring Diagram Fig 33 Power and command wiring diagram CGAD 070C Sheet 1 2...
Page 60: ...CGAD SVN02C EN 60 Wiring Diagram Fig 41 Power and command wiring diagram CGAD100 Part I...
Page 61: ...CGAD SVN02C EN 61 Wiring Diagram Fig 42 Power and command wiring diagram CGAD100 Part II...
Page 62: ...CGAD SVN02C EN 62 Wiring Diagram Fig 43 Power and command wiring diagram CGAD100 Part III...
Page 63: ...CGAD SVN02C EN 63 Wiring Diagram Fig 44 Layout diagram CGAD100...
Page 64: ...CGAD SVN02C EN 64 Wiring Diagram Fig 45 Power and command wiring diagram CGAD120 Part I...
Page 65: ...CGAD SVN02C EN 65 Wiring Diagram Fig 46 Power and command wiring diagram CGAD120 Part II...
Page 66: ...CGAD SVN02C EN 66 Wiring Diagram Fig 47 Power and command wiring diagram CGAD 120 Part III...
Page 67: ...CGAD SVN02C EN 67 Wiring Diagram Fig 48 Layout diagram CGAD 120...
Page 68: ...CGAD SVN02C EN 68 Wiring Diagram Fig 49 Power and command wiring diagram CGAD150 Part I...
Page 69: ...CGAD SVN02C EN 69 Wiring Diagram Fig 50 Power and command wiring diagram CGAD150 Part II...
Page 70: ...CGAD SVN02C EN 70 Wiring Diagram Fig 51 Power and command wiring diagram CGAD150 Part III...
Page 71: ...CGAD SVN02C EN 71 Fig 52 Layout diagram CGAD150 Wiring Diagram...
Page 72: ...CGAD SVN02C EN 72 Wiring Diagram Fig 53 Layout diagram CGAD 100 125 150 with optionals...