24
T-Series Climate Changer Air Handler IOM •
CLCH-SVX06A-EN
Installation-Mechanical
•
Never lift units in windy conditions. Personnel should be positioned overhead and on
the ground to guide the crane or helicopter operator in positioning the sections.
•
Never stack the pipe cabinet and inlet hoods on the unit as the unit is being lifted.
•
Do not attach the intake/exhaust hoods to the unit prior to lifting the unit. Doing so
may damage the equipment. Attach the hoods to the unit only after all sections are
in place.
•
Remove all wooden blocks before installing the unit to the roof curb. See
Figure 5
.
•
After the sections are in place, assemble the unit. See
“Assembling the Unit” on
page 28
.
Figure 5.
Shipping block removal
Remove all wooden blocks before
installing unit to roof curb