CLCH-SVX06A-EN •
T-Series Climate Changer Air Handler IOM
33
Installation-Mechanical
Pipe Cabinet (Chase) Installation
Figure 17.
Pipe cabinet attachment
See drawing MS2999-5696 in the hardware package.
•
Apply 1-inch butyl tape around perimeter of hood and
pipe cabinet prior to attaching to unit. See
Figure 16
.
•
Attach hood/pipe cabinet to unit with #10 x 3/4 self-
drilling screws. Place screws in all holes provided in
attachment flanges. See
Figure 17
.
If piping has been run before attaching pipe cabinet to
unit, follow these steps:
1.
Detach Z-bar and rest against unit.
2. Slide pipe cabinet against unit.
3. Remove access panel to tighten bolts which hold Z-
bar in place.
4. Attach top Z-bar flange to unit.
5. Caulk around Z-bar attachment angle. See
Figure 18
.
6. Remove paper backing from butyl tape around cut-
out.
7.
Reinstall access panel.
If piping has been run after attaching pipe cabinet to unit,
follow these steps:
1.
Remove access panel.
2. Remove paper backing from butyl tape around cut-
out.
3. Reinstall access panel.
Figure 18. Pipe chase Z-bar installation
Attachment
flange
Panel removed
to show Z bar
Unit side panel
Z bar attachment
angle
Z bar
Gutter
Pipe cabinet
base rail
Gutter