110
CVHH-SVX001G-EN
aggressiveness of the water that is in the system. Some
sites could require anode replacement every two to
three months while other sites may require anode
replacement every two to three years. Trane
recommends inspection of anodes for wear sometime
within the first several months of the anodes being
placed into service. If the observed loss of anode
material is small, then the interval between subsequent
inspections can be lengthened. Replace the anode and/
or shorten the inspection interval if the anode has lost
50 percent or more of its original mass. If anode
depletion occurs very quickly, consult a water
treatment specialist to determine if the anode material
selected is correct for the application.
N
NO
OT
TIIC
CE
E
E
Eq
qu
uiip
pm
me
en
ntt D
Da
am
ma
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss cco
ou
ulld
d rre
essu
ulltt iin
n
e
eq
qu
uiip
pm
me
en
ntt d
da
am
ma
ag
ge
e..
D
Do
o N
NO
OT
T u
usse
e T
Te
effllo
on
n--b
ba
asse
ed
d tta
ap
pe
e o
orr p
pa
asstte
e o
on
n a
an
no
od
de
e;;
a
a ssm
ma
allll a
am
mo
ou
un
ntt o
off lliiq
qu
uiid
d sse
ea
alla
an
ntt ((L
Lo
occttiitte
e®
® 2
24
42
2 o
orr
e
eq
qu
uiiv
va
alle
en
ntt)) m
ma
ay
y b
be
e a
ap
pp
plliie
ed
d tto
o p
prre
ev
ve
en
ntt lle
ea
akka
ag
ge
e
w
wh
he
en
n iin
nsstta
alllliin
ng
g a
an
n a
an
no
od
de
e,, b
bu
utt d
do
o n
no
ott a
ap
pp
plly
y sso
o
m
mu
ucch
h sse
ea
alla
an
ntt tth
ha
att iitt p
prre
ev
ve
en
nttss tth
he
e n
ne
ecce
essssa
arry
y
e
elle
eccttrriicca
all cco
on
nn
ne
eccttiio
on
n b
be
ettw
we
ee
en
n tth
he
e a
an
no
od
de
e a
an
nd
d tth
he
e
w
wa
atte
errb
bo
ox
x..
As needed after draining the waterbox, use a 2-1/2 in.
(63.5 mm) wrench to remove/install Trane-supplied
waterbox anodes.
RuptureGuard Maintenance
It is recommended that the RuptureGuard
™
be visually
inspected and the relief valve pressure tested annually.
The test can be performed with the valve in place and
the refrigerant in the chiller.
The vent-line drip-leg must be periodically checked for
accumulation of water or refrigerant. Drain any
accumulation that may be present into an evacuated,
properly labeled vessel and dispose of in accordance
with local, state, and federal codes.
EarthWise Purge
Maintenance
To ensure efficient and reliable purge operation,
perform all inspections and procedures at the
prescribed intervals. Keep records of inspection results
to establish proper service intervals. Document
changes that occur in purge activity that could provide
information about chiller performance.
W
WA
AR
RN
NIIN
NG
G
R
Re
effrriig
ge
erra
an
ntt u
un
nd
de
err H
Hiig
gh
h P
Prre
essssu
urre
e!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d rre
essu
ulltt iin
n
a
an
n e
ex
xp
pllo
ossiio
on
n w
wh
hiicch
h cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr
sse
erriio
ou
uss iin
njju
urry
y o
orr e
eq
qu
uiip
pm
me
en
ntt d
da
am
ma
ag
ge
e..
S
Sy
ysstte
em
m cco
on
ntta
aiin
nss o
oiill a
an
nd
d rre
effrriig
ge
erra
an
ntt u
un
nd
de
err h
hiig
gh
h
p
prre
essssu
urre
e.. R
Re
ecco
ov
ve
err rre
effrriig
ge
erra
an
ntt tto
o rre
elliie
ev
ve
e p
prre
essssu
urre
e
b
be
effo
orre
e o
op
pe
en
niin
ng
g tth
he
e ssy
ysstte
em
m.. S
Se
ee
e u
un
niitt n
na
am
me
ep
plla
atte
e ffo
orr
rre
effrriig
ge
erra
an
ntt tty
yp
pe
e.. D
Do
o n
no
ott u
usse
e n
no
on
n--a
ap
pp
prro
ov
ve
ed
d
rre
effrriig
ge
erra
an
nttss,, rre
effrriig
ge
erra
an
ntt ssu
ub
bssttiittu
utte
ess,, o
orr rre
effrriig
ge
erra
an
ntt
a
ad
dd
diittiiv
ve
ess..
W
WA
AR
RN
NIIN
NG
G
H
Ha
azza
arrd
do
ou
uss V
Vo
olltta
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o d
diisscco
on
nn
ne
ecctt p
po
ow
we
err b
be
effo
orre
e sse
errv
viicciin
ng
g cco
ou
ulld
d
rre
essu
ulltt iin
n d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y..
D
Diisscco
on
nn
ne
ecctt a
allll e
elle
eccttrriicc p
po
ow
we
err,, iin
nccllu
ud
diin
ng
g rre
em
mo
otte
e
d
diisscco
on
nn
ne
eccttss b
be
effo
orre
e sse
errv
viicciin
ng
g.. F
Fo
ollllo
ow
w p
prro
op
pe
err
llo
occkko
ou
utt//tta
ag
go
ou
utt p
prro
occe
ed
du
urre
ess tto
o e
en
nssu
urre
e tth
he
e p
po
ow
we
err
cca
an
n n
no
ott b
be
e iin
na
ad
dv
ve
errtte
en
nttlly
y e
en
ne
errg
giizze
ed
d.. V
Ve
erriiffy
y tth
ha
att n
no
o
p
po
ow
we
err iiss p
prre
esse
en
ntt w
wiitth
h a
a v
vo
ollttm
me
ette
err..
X39003892001A
N
No
otte
e:: Graphic labels (shown above) are used for CE
application only.
IIm
mp
po
orrtta
an
ntt::
•
Before servicing, disconnect all power
sources and allow at least 30 minutes
for capacitors to discharge.
•
All electrical enclosures—unit or remote
—are IP2X.
Summary of Contents for CVHH CenTraVac
Page 126: ...126 CVHH SVX001G EN N No ot te es s ...