Installation
ACC-SVN232A-EN
7
3. Block-off installation
a. Attach block-off 5 to unit using four screws as
The block-off is designed to close the opening created
between the economizer and the base, when the
economizer assembly is in its operating position.
b. Remove approximately 3-inch of gasket material
from the bottom of each corner post to expose the
holes used to attach the economizer assembly to
the unit, as illustrated in
detail "A".
Note:
There are two holes, a (large) clearance hole and a
(small) engagement hole. Their function will be
discussed later.
4. Economizer assembly installation
a. Place tape (refer to
shipping screws were removed.
b. Place the economizer assembly into the opening
with the back right flange, on the economizer,
behind the corner post flange, as illustrated in
following figure.
c. Position the left side flange on the economizer in
front of the corner post flange.
d. With the screws provided, secure the bottom right
hand side of the economizer assembly by inserting
the screws through the clearance holes in the
corner post and into the engagement holes in the
economizer assembly. Refer to
e. Secure the bottom left hand side of the economizer
assembly by inserting the screws through the
clearance holes in the economizer assembly and
into the engagement holes of the corner post. Refer
to
.
f. Secure economizer using four screws on left side
and 4 screws on right side as illustrated in
.
g. Attach connecting rod bracket to outdoor damper
blade using two screws on each side as illustrated
in following figure, detail "B". Check for binding by
slowly operating the dampers by hand.
Figure 5.
Install block-off
Figure 6.
Remove gasket material
Figure 7.
Install economizer assembly
Figure 8.
Attach connecting rod bracket