Roof Curb and Ductwork
The roof curbs for W_HE casings 2 through 9 units consists
of a "full perimeter" enclosure to support the unit.
Before installing any roof curb:
1. Verify that it is the correct curb for the unit,
2. Verify that it includes the necessary gaskets and
hardware,
3. Verify that the purposed installation location provides
the required clearance for proper operation.
4. Insure that the curb is level and square. The top surface
of the curb must be true to assure an adequate curb-to-
unit seal.
Step-by-step curb assembly and installation instructions
ship with each Trane accessory roof curb kit. Refer to the
applicable sections in the current edition of RT-SVN14*-EN
for W_HE casings 2 through 9. Follow the instructions
carefully to assure proper fit-up when the unit is set into
place.
Note:
To assure proper condensate flow during
operation, the unit (and curb) must be as level as
possible. The maximum slope allowable for
rooftop unit applications is 4" end-to-end and 2"
side-to-side excluding WSHE. Units with steam
coils (WSHE's) must be set level!
If the unit is elevated, a field constructed catwalk around
the unit is strongly recommended to provide easy access
for unit maintenance and service.
Recommendations for installing the Supply and Return Air
ductwork joining the roof curb are included in the curb
instruction booklet. Curb ductwork must be fabricated and
installed by the installing contractor before the unit is set
into place.
Note:
For sound considerations, cut only the holes in the
roof deck for the ductwork penetrations. Do not cut
out the entire roof deck within the curb perimeter.
Trane's Engineering Bulletin RT-PRB022-EN provides
additional information concerning duct design and sound
reduction.
Pitch Pocket Location
The location of the main supply power entry for W_HE
Casings 2 through 6 units is located in the bottom right-
hand area of the control panel.
illustrates
the electrical entrance location for the control panel. If the
power supply conduit penetrates the building’s roof
Chilled Water Coil
(b)
- Aluminum
(Shipping/Operating)
462/564
591/751
(1) 344/418
(2) 462/564
(1) 451/551
(5-Row) 722
(1)424/517
(1)554/680
(2) 957/1184
Chilled Water Coil
- Copper
(Shipping/Operating)
955/1057
1307/1468
(1) 702/777
(2) 955/1057
1) 955/1057
(1) 872/965
(1) 1173/1299 (2) 2097/2325
Hot Water Coil
217
217
269
269
324
Steam Coil
176
176
256
256
312
552
Supply Motor Std.
122
231
304
345
455
448
Supply Motor Hi-Eff.
140
195
280
360
480
(2) 455
Exhaust Motor - Std.
60
104
122
191
231
(2) 480
Exhaust Motor - Hi-Eff.
64
113
140
189
195
455
Supply Fan Assy.
234
344
530
530
748
480
Variable Frequency Drive
21
27
32
38
49
(2) 735
Exhaust Fan Assy
234
234
344
324
530
(2) 100
Gas Heat Low
(Includes Control Box)
270
306
306
395
395
748
Gas Heat High
(Includes Control Box)
395
395
630
630
630
800
Electric Heat
(c)
(Includes Control Box)
130
130
155
155
155
Main Control Box
150
150
200
220
250
155
Filter Assembly
60
70
70
85
100
350
FA/RA Damper
45
60
75
90
95
125
Exhaust Damper
(2) 30
(2) 35
(2) 50
(2) 55
(2) 50
150
Eliminator Panel
(1) 50
(1) 58
(1) 68
(2)75
(2) 60
(2) 55
(a) Cabinet weights are estimated based on:
4.4 Lbs./Ft2of surface for Casing Sizes 2-5.
4.6 Lbs./Ft2 of surface area for Casing Size 6.
(b) Chilled Water coil weights are for maximum size coil.
(c) Estimated Weights
Table 5.
Component weights (Lbs.) — casings 2-9
Summary of Contents for IntelliPak WEHE Series
Page 15: ...General Information RT SVX35H EN 15 Figure 1 Unit component layout and ship with locations...
Page 17: ...Installation RT SVX35H EN 17 Figure 2 Typical control module location...
Page 44: ...Installation 44 RT SVX35H EN Figure 27 Typical field power wiring for W_HE casings 2 through 6...
Page 56: ...Installation 56 RT SVX35H EN Figure 32 Wiring notes for CV controls...
Page 60: ...Installation 60 RT SVX35H EN Figure 35 Wiring notes VAV...
Page 68: ...System Start up 68 RT SVX35H EN Figure 38 Typical fenwall ignition control system...
Page 69: ...System Start up RT SVX35H EN 69 Figure 39 Typical Fenwall ignition control system...