LPC-SVX01C-EN
41
installation
procedure
Installation
Step 3.
Line up the holes on the unit and module
and attach together using a #10 - 16 x 0.5
inch screw.
Step 4.
Line up the corner brackets on the
module being joined.
Step 5.
Attach the corner brackets using a bolt
and nut.
Note: Gasketing is not required on these
units. The Packaged Climate Changer is
designed and tested to be used without
gasketing. All screws, nuts, and bolts
required for installation are field supplied.
Summary of Contents for LPC
Page 50: ...50 LPC SVX01C EN Operation general information Figure O GI 9 Tracer AH540 termination board ...
Page 91: ...LPC SVX01C EN 91 Maintenance diagnostics Table M D 2 Tracer AH540 541 diagnostics ...
Page 92: ...92 LPC SVX01C EN Maintenance diagnostics Table M D 2 continued Tracer AH540 541 diagnostics ...
Page 94: ...94 LPC SVX01C EN Maintenance troubleshooting Table M T 2 Valves stay open ...
Page 95: ...LPC SVX01C EN 95 Maintenance troubleshooting Table M T 3 Valves stay closed ...
Page 96: ...96 LPC SVX01C EN Maintenance troubleshooting Table M T 4 Outdoor air damper stays open ...
Page 97: ...LPC SVX01C EN 97 Maintenance troubleshooting Table M T 5 Outdoor air damper stays closed ...
Page 107: ...LPC SVX01C EN 107 Maintenance appendix Table M A 6 Hard wired CO2 sensor values ...
Page 109: ......