Component Installation
CLCH-SVX013B-EN
39
3. Bottom of unit base elevation is flush with duct
opening in bottom of unit (see
Figure 52.
Field-supplied duct connection to AHU bottom supply/return air opening
Bottom supply/
return airflow
Field-supplied
rigid duct
Field-supplied
rigid duct
Typical Trane
air handler base
Typical Trane
air handler base
Figure 53.
Field-supplied duct connection details - curb
mount for outdoor units
Field-supplied
duct
Gasket
Supply opening
in floor
Roof curb
Unit wall
Unit floor
Building roofing and
structure may vary per job
Unit base
7.25 inches
1 in. flange
16 ga
Figure 54.
Field-supplied duct connection details - pier
mount for outdoor units
Gasket
Supply opening
in floor
Unit wall
Unit floor
Building roofing and
structure may vary per job
Unit base
1 in. flange
Field-supplied
duct
Discharge Plenum Connections
Discharge plenum sections are available with or without
openings. Sections with rectangular and round openings
have a framed opening that can be used to secure the duct
to the frames. If the duct is lined, it is important the
insulation does not obstruct the opening of the section.
For a discharge plenum with field-cut openings, attach the
duct to the side panel.