background image

CPSMP-200

6

Tech Support:  

1-800-260-1312

-- International:  

00-1-952-941-7600

-- (24 hours)

WARNING:  Do not connect the power supply module to the external power
source before installing it into the chassis.  Failure to observe this caution could
result in equipment damage and/or personal injury or death.

Maintenance

Replace the CPSMP-200

NOTE:  

The CPSMP-200 power supply module may be “hot swapped” (i.e.,

replaced while the chassis is in operation) 

provided the module to be

replaced has been disconnected from its external power source and the
module’s On/Off switch has been set to “0”.

To replace the CPSMP-200 power supply module:

1.

Ensure the On/Off switch on the power supply module is set to 

“0”

.

2.

Disconnect the AC power cord from the AC power source.

3.

Remove the two (2) screws that secure the power supply module to the
chassis.  Retain the screws for installing the replacement module.

4.

Carefully slide the power supply module out of the chassis.  

I
0

On/Off Switch

AC Power Cord

I
0

I
0

techsupport@transition.com

-- Click the 

“Transition Now”

link for a live Web chat.

7

5.

Set the Primary/Secondary switch and the Management/Manual switch on
the replacement power supply module, if necessary (see page 3).

6.

Carefully slide the replacement power supply module into the installation
slot, aligning the module with the installation guides.  

7.

Ensure that the power supply module is firmly seated inside the chassis.

8.

Carefully install the two (2) retained screws through the power supply
module into the chassis, rotating clockwise to secure.

9.

See the “

Connect to External Power

” section (page 5) for instructions on

re-connecting the power supply module to the external power source.

I
0

I
0

Primary/Secondary Switch

and

Management/Manual Switch

Summary of Contents for CPSMP-200

Page 1: ...tch that when set to I allows the module to supply power to the PointSystem chassis A Primary Secondary switch that allows the module to be configured as the primary or as the secondary power supply A Management Manual switch that allows the PointSystem software to control and override the physical setting of the Primary Secondary switch A fan to cool the interior of the PointSystem chassis A hand...

Page 2: ...e power supply module has the configuration as set by the Primary Secondary switch The software interface cannot change the setting I 0 Manual Management Secondary Primary techsupport transition com Click the Transition Now link for a live Web chat 3 Primary Secondary Switch The Primary Secondary switch allows the module to be configured as the Primary or as the Secondary power supply As the Prima...

Page 3: ...ly module into the installation slot aligning the module with the installation guides Ensure that the power supply module is firmly seated against the chassis backplane 5 Carefully install the two 2 screws retained in step 1 through the power supply module and into the chassis Rotate the screws clockwise to secure I 0 I 0 I 0 Primary Secondary Switch and Management Manual Switch techsupport transi...

Page 4: ...2 screws that secure the power supply module to the chassis Retain the screws for installing the replacement module 4 Carefully slide the power supply module out of the chassis I 0 On Off Switch AC Power Cord I 0 I 0 techsupport transition com Click the Transition Now link for a live Web chat 7 5 Set the Primary Secondary switch and the Management Manual switch on the replacement power supply modu...

Page 5: ...ion in the power supply module Snap the fuse holder into place 7 See the Connect to External Power section page 5 for instructions on re connecting the power supply module to the external power source I 0 On Off Switch Fuse Holder Fuse techsupport transition com Click the Transition Now link for a live Web chat 9 Technical Specification For use with Transition Networks Model CPSMP 200 or equivalen...

Page 6: ...t is available 24 hours a day US and Canada 1 800 260 1312 International 00 1 952 941 7600 Transition Now Chat live via the Web with Transition Networks Technical Support Log onto www transition com and click the Transition Now link Web Based Seminars Transition Networks provides seminars via live web based training Log onto www transition com and click the Learning Center link E Mail Ask a questi...

Page 7: ... the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the inte...

Reviews: