Transition Networks
E-MCR-05 User Guide
33392 Rev. C
Page 3 of 12
Safety Instructions for Rack Mount Installations
The instructions below (or similar) are intended for rackmount installation environments:
1.
Elevated Operating Ambient: if installed in a closed or multi-unit rack assembly, the operating ambient
temperature of the rack environment may exceed room ambient. Install the equipment in an environment
compatible with the maximum ambient temperature (Tma) specified.
2.
Reduced Air Flow: install the equipment in a rack so that the amount of air flow required for safe operation
is not compromised.
3.
Mechanical Loading: Mount the equipment in the rack so that a hazardous condition does not occur due to
uneven mechanical loading (weight distribution/rack balance).
4.
Circuit Overloading: consider the connection of the equipment to the supply circuit and the effect that
overloading of the circuits might have on overcurrent protection and supply wiring. Consider all equipment
nameplate ratings when addressing this concern.
5.
Reliable Earthing: maintain reliable earthing of rack-mounted equipment; pay attention to supply
connections other than direct connections to the branch circuit (e.g., use of power strips).
Mount the E-MCR-05 into a Rack
The E-MCR-05 is
4.725”
(2.7U) high
which can be mounted as follows:
1.
Locate four (4) screws (provided) and optional clip-nuts (not provided) for each E-MCR-05 Media Converter Rack.
2.
Carefully align the E-MCR-05 at a level position between the rack mounting rails as shown on the next page.
3.
Install two (2) screws through the right front bracket and two (2) screws through the left front bracket; use the clip nuts
to secure the E-MCR-05 to the rack.