background image

Installation Manual

 | 

AC Edge 240

6

Factors Affecting Installation

Elevated Operating Ambient

If installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack environment may be greater than 

room ambient.  Therefore, consideration should be given to installing the equipment in an environment compatible with the maximum 

ambient temperature specified by Transtector.

Reduced Air Flow

Installation of the equipment in a rack should be such that the amount of airflow required for safe operation of the equipment is not 

compromised.

Mechanical Loading

Mounting of the equipment in the rack should be such that a hazardous condition is not achieved due to the uneven mechanical  

loading.

Circuit Overloading Consideration

Consideration should be given to the connection of the equipment to the supply circuit and the effect that overloading of the circuits 

might have on over-current protection and supply wiring.  Appropriate consideration of equipment nameplate ratings should be used 

when addressing this concern.

Reliable Earthing

Reliable earthing of the rack-mounted equipment should be maintained.  Particular attention should be given to supply connections 

other than direct connections to the branch circuits (ACEG).

Disconnect Device

A readily accessible disconnect device should be incorporated in the building installation wiring.

Warnings

This product shall be installed and serviced only by qualified personnel.  The product is intended for installation in a restricted access 

area.  Only use tools (for example, crimping tools, dies) and components (for example, breakers and wiring connectors) approved by 

recognized agencies and authorities (for example, UL, TUV, NEC).

Hazardous Voltage.  Multiple power sources may be available.  Disconnect all power before servicing.  Before connecting input power 

cables make sure input power to panel is turned off.  Read and understand these instructions before installing this product.  If neces-

sary, contact Transtector for technical assistance: by phone at 1.800.882.9110 or 208.772.8515.  Or email us at customerservice@

smithspower.com.

Summary of Contents for AC Edge 240

Page 1: ...Installation Manual 1101 1173 M REV H AC Edge 240 Dual Phase 60A 6 6 AC Power Distribution Unit Model AC240V60DF 6 6 P N 1101 1173...

Page 2: ...on Procedure Inspect Shipping Container Inspect Contents of Container Accessory Kit Installing Mounting Brackets Mounting Panel to Rack Ground Wiring Input Wiring Test Voltages and Alarms Outputs Brea...

Page 3: ...front of the panel contains six LEDs One on each line labeled PWR the LED is green when power is supplied to the unit and off when no power is supplied One on each line for tripped breaker indication...

Page 4: ...A output per phase and 10 A per output position L1 input feeds L1 outputs L2 input feeds L2 outputs Breaker Output Current 1 A to 10 A single pole hydraulic magnetic non delay slow trip breakers sold...

Page 5: ...7 kg Weight shipping 20 lbs 9 kg Chassis Dimensions Nominal without rack mounting brackets 3 47 H x 17 4 W x 13 5 D 88 mm x 442 mm x 342 mm Rack Mounting 2RU 19 per EIA Standard RS 310 D optional 23...

Page 6: ...priate consideration of equipment nameplate ratings should be used when addressing this concern Reliable Earthing Reliable earthing of the rack mounted equipment should be maintained Particular attent...

Page 7: ...carrier s representative be present during unpacking Note Transtector is not liable for damages incurred during shipping Inspect Contents of Container 2 During unpacking inspect panel for damage If d...

Page 8: ...Installation 8 Flat Washer 12 Panel to Rack Installation 4 Lock Washer 12 Split Panel to Rack Installation 4 Screw 12 24 x 5 Pan Head Phillips Panel to Rack Installation 4 19 Mounting Bracket Rack Mo...

Page 9: ...kg Take care to support the panel when installing panel to rack Two persons may be required in the following step 9 Mount panel to rack using two sets of supplied fasteners per side total of four 12 2...

Page 10: ...ound lug The ground lug is located just left of the access panel shown in Figure 3 12 Fasten lug to panel using the provided M6 KEPS nuts and flat washers Tighten to 50 55 inch pounds 6 2 Newton meter...

Page 11: ...position and NEUTRAL 2 to the 2nd position from the bottom of the input terminal block see Figure 4a and 4b To secure wires follow figure 4a 1 Strip wire to 18mm 0 70in 2 Fully insert wire into termi...

Page 12: ...L1 Power Alarm NC 10 L1 Suppression Status NO 3 L2 Power Alarm NO 11 L2 Suppression Status NC 4 L2 Power Alarm NC 12 L2 Suppression Status NO 5 L1 Fuse Alarm NO 13 Common 6 L1 Fuse Alarm NC 14 Common...

Page 13: ...installation of breakers ensure that circuit breakers are switched off 27 Install circuit breakers in the off position with ON letters oriented towards the top of the unit and OFF towards the bottom...

Page 14: ...and free the breaker see Figure 6 Figure 6 Removing a breaker Circuit Breakers The AC Edge 240 panel is compatible with single pole Carling Technologies M Series or AIRPAX SNAPAK series hydraulic magn...

Page 15: ...15 Transtector 2017 All Rights Reserved Dimensions...

Page 16: ...AWG YAV10 2TC14 8 AWG YA8CL 2TC14 LCD8 14A L 6 AWG YA6CL 2TC14 LCD6 14A L 4 AWG YA4CL 2TC14 LCD4 14A L 2 AWG YA2CL 2TC14 LCD2 14A Q Maintenance AC Edge 240 panels require no scheduled maintenance Ser...

Page 17: ...duct Transtector conveys no license under its patent rights or those of others Transtector reserves the right to change this product and this publication without notice Transtector Systems Inc 10701 A...

Reviews: