24
Installation
(for qualified installers only)
© Travis Industries
4121120
100-01315
Vent Termination Requirements (see illustration below)
!
Venting terminals shall not be recessed into a wall or siding.
A
Minimum 9" (229mm) clearance from any door or window
B
Minimum 12" (305mm) above any grade, veranda, porch, deck or balcony
C
Minimum 1" (25mm) from outside corner walls
NOTE
: Clearance in accordance with local installation codes and the requirements
of the gas supplier.
D
Minimum 12" (305mm) from inside corner walls
NOTE
: Clearance in accordance with local installation codes and the requirements
of the gas supplier.
E
Minimum 11" (279mm) clearance below unventilated soffits or roof surfaces
Minimum 18" (457mm) clearance below ventilated soffits
Minimum 6" (152mm) clearance below roof eaves
NOTE
: Vinyl surfaces require 24" (610mm)
NOTE
: Clearance in accordance with local installation codes and the requirements of the gas supplier.
F
Minimum 12" (305mm) clearance below a veranda, porch, deck or balcony
NOTE
: Permitted only if veranda, porch, deck, or balcony is fully open on a minumum of two sides beneath the floor.
NOTE
: Clearance in accordance with local installation codes and the requirements of the gas supplier.
G
Minimum 48" (1219mm) clearance from any adjacent building
H
Minimum 84" (2134mm) clearance above any grade when adjacent to public walkways or driveways
NOTE: may not be used over a walkway or driveway shared by an adjacent building
I
Minimum 9" (229mm) clearance to any nonmechanical air supply inlet to the building or the combus tion air inlet to
any other appliance.
J
Minimum 36" (914mm) clearance above any mechanical air supply inlet if within 10’ (3M) horizontally
K
Minimum 36" (914mm) from the area above the meter/regulator (vent outlet) -
this extends 15’ (4.5M) above the regulator
NOTE
: Clearance in accordance with local installation codes and the requirements of the gas supplier.
L
Minimum 36" (914mm) from the meter/regulator (vent outlet)
NOTE
: Clearance in accordance with local installation codes and the requirements of the gas supplier.
M
Minimum 12” (305mm) above the roof line (for vertical terminations)
N
Minimum 24” (610mm) horizontal clearance to any surface (such as an exterior wall) – for vertical terminations
•
Use the vinyl siding standoff when installing on an exterior with vinyl siding.
•
Vent termination must not be located where it will become plugged by snow or other material