37
I-4
Insert the bellcrank posts through
the bellcranks. Study to photo closely
to insure that the bellcrank post
inserts through the bottom of the left
bellcrank (note that the boss on the
bellcrank arm points up).
H-28
Slide the pulley flange onto the shaft with the beveled edge facing the
pulley. Secure the pulley with a large E-clip.
BAG-I
Bellcrank Assembly
I-1
Bellcrank Assembly: Locate the left and right bellcranks and (4) 5x8mm
ball bearings.
I-2
Insert two 5x8mm ball bearings into each bellcrank
I-3
Locate the (2) bellcrank posts, (2) bellcrank spacers, (1) 3x8mm and (1)
3x10mm buttonhead machine screw. The bellcrank posts and spacer
are blue anodized.
Left
bellcrank
Boss