32
minipool
Q
uarz
10
84
50
50
50
50
(measurements in cm)
A
Technical compartment for maintenance
of operational components: plan for 50
cm on all sides of the minipool
B
Internal drainage grates
E
Insulation: prevents damage
from freezing and condensa-
tion
D
2 Ø15 cm vents to ensure
proper ventilation of the
technical compartment
C
Non-slip flooring
CONCRETE SLAB h. 10 cm
minimum
BUILT-IN INSTALLATIONS
As a base, create an underground reinforced concrete
niche, with a minimum thickness of 10 cm, perfectly flat
and suitable to support the weight of the mini-pool and
its guests. The company recommends a minimum load of
420 kg/m
2
(Quarz 212 - Quarz 212 TOP) 600 kg/m
2
(Quarz
325). In any case contact a qualified construction engineer
to calculate the appropriate load for your installation site.
Wedges or shims cannot be placed under the
minipool to level it.
Remember to ground the structural reinforcement
in accordance with electrical codes.
Prepare:
•
A
A technical inspection port
*
at least 50 cm wide on
all sides of the minipool. This will make future mainte-
nance or repairs easier.
•
B
drainage grating
around the perimeter and in the
recess to help preserve the equipment and the struc-
ture
(even for indoor installations).
•
C
A non-slip flooring around the minipool.
•
D
Two Ø15 cm vents to ensure proper ventilation and
extraction of the heat and moisture from the technical
compartment.
FOR THE RECESSED OUTDOOR INSTALLATIONS, to
avoid damage due to freezing we recommend insulat-
ing
E
the minipool recess. This procedure prevents
excessive condensation that over time cause odours and
damage to all major internal components. The choice of
materials and thickness should be based on the minimum
temperatures reached in the country of installation.
For the preparation of the electrical connections
see the pertinent section on page 33.
B
See the electrical arrangements on
page 29 and page 33
See drain
arrangement on
page 29
Pre-Installation