Tran
spor
t and
ins
ta
llat
ion
Transport and unpacking
30
07/2019 244156V03_EN
4.2
Transport and unpacking
4.2.1
Unloading the machine
1. Observe the safety instructions.
2. Take the weight of the packages from the shipping paperwork.
3. Use means of transport with sufficient load-bearing strength to trans-
port the packages.
4. Transport the machine in a horizontal position.
4.2.2
Unpacking the machine
The machine is transported from the factory in secure packaging.
1. Remove the packaging and examine the machine for any possible
transport damage.
Submit a written complaint to the carrier immediately in the event of
transport damage!
2. Compare the delivery with the delivery note!
4.2.3
Installation
1. Both the front castors are equipped with a parking brake so that the ma-
chine is stable during operation.
2. Press down the locking lever
(1)
to lock the brake.
3. You must release the brake to move the machine.
4. Press down the unlocking lever
(2)
to release the brake.
1
2
AR1006 / 0
Summary of Contents for PRIMUS 400
Page 2: ......
Page 3: ......
Page 4: ......
Page 7: ......
Page 11: ...Table of contents Table of contents 07 2019 244156V03_EN...
Page 31: ...Safety Safety layout 20 07 2019 244156V03_EN...
Page 43: ...Transport and installation Installation and connection 32 07 2019 244156V03_EN...
Page 57: ...Start up Switch off 46 07 2019 244156V03_EN...
Page 69: ...Operation If a malfunction occurs 58 07 2019 244156V03_EN...
Page 85: ...Visualisation Additional information on the display 74 07 2019 244156V03_EN...
Page 104: ...Maintenance Sharpening the blade 07 2019 244156V03_EN 93...
Page 105: ...Maintenance Sharpening the blade 94 07 2019 244156V03_EN...
Page 109: ...Help and Service If any fault occurs 98 07 2019 244156V03_EN...
Page 116: ...Index 07 2019 244156V03_EN 105 W Workplace lighting 10...
Page 117: ...Index 106 07 2019 244156V03_EN...