Clea
ning
Completion work after the cleaning
86
07/2019 244156V03_EN
9.6
Completion work after the cleaning
Lifting removal chamber:
1. Lift the removal chute
1
to the top end position (working position) and
hold it in this position from underneath with one hand.
2. Secure the two locks so that the removal chamber is held securely.
Inserting crumb tray:
1. Insert the crumb tray
1
at the bottom into the blade box.
2. Close the front door (
“Closing front door:” on page 87).
1
AR1019 / 0
1
AR1020 / 0
Summary of Contents for PRIMUS 400
Page 2: ......
Page 3: ......
Page 4: ......
Page 7: ......
Page 11: ...Table of contents Table of contents 07 2019 244156V03_EN...
Page 31: ...Safety Safety layout 20 07 2019 244156V03_EN...
Page 43: ...Transport and installation Installation and connection 32 07 2019 244156V03_EN...
Page 57: ...Start up Switch off 46 07 2019 244156V03_EN...
Page 69: ...Operation If a malfunction occurs 58 07 2019 244156V03_EN...
Page 85: ...Visualisation Additional information on the display 74 07 2019 244156V03_EN...
Page 104: ...Maintenance Sharpening the blade 07 2019 244156V03_EN 93...
Page 105: ...Maintenance Sharpening the blade 94 07 2019 244156V03_EN...
Page 109: ...Help and Service If any fault occurs 98 07 2019 244156V03_EN...
Page 116: ...Index 07 2019 244156V03_EN 105 W Workplace lighting 10...
Page 117: ...Index 106 07 2019 244156V03_EN...