4
RS-WMB, RD-WMB Installation Instructions TG201349 Issue 4, 26-Aug-2015. Applies to 1.02.2.
RS-WMB, RD-WMB
Installation Instructions
8
Configure Controller Strategy
(not pre-configured controllers)
9
Replace Front Panel
3 InStAllAtIon
(continued)
Use with IQ4
The IQ4 can be configured either by using the SET strategy
block (recommended), or by manual configuration.
Using the SEt strategy block (recommended):
▪
Add the SET Strategy Block to the strategy. The
strategy blocks are located in the ‘Standard Block’
section of the Strategy Library in the ‘WMB Room
Modules’ section. There is a separate section for RS
and RD, each section has 4 blocks, one block for each
product version (-T, -TC, -TH, -THC).
▪
Set the Wallbus Interface module’s ‘Address’
parameter to the RS-WMB, RD-WMB’s address on
the Wallbus (default is 2.)
▪
Ensure that the Wallbus Interface module’s inputs and
outputs are linked to the required modules.
Important:
When using the strategy block (as explained
above) some PVs write their value to the RD-WMB and will
overwrite changes to that PV made in the RD-WMB’s Settings
Menu. If this is not required, remove the PV from the Wallbus
Interface module’s inputs. See RS-WMB, RD-WMB Data
Sheet (TA201348).
Adding the strategy block will automatically add the Wallbus
Network module, and create an instance of the Wallbus
Interface module.
The strategy block configures the inputs and outputs of the
Wallbus Interface module - see RS-WMB, RD-WMB Data
Sheet (TA201348). This configuration should be suitable for
most applications. If different functionality is required the
strategy will need to be modified after the strategy block has
been added.
Manual configuration:
▪
Add the Wallbus Network module to the strategy
(default values will be suitable).
▪
Add a Wallbus Interface module to the strategy.
▪
SET the Wallbus Interface module’s ‘Address’
parameter to the RS-WMB, RD-WMB’s address on
the Wallbus.
▪
Set up the Wallbus Interface module’s input and
output connections to specify the PV (PV Index) in the
RS-WMB, RD-WMB that they are to be linked to as well
as their other parameters. The RS-WMB, RD-WMB’s
PVs are described in the RS-WMB, RD-WMB Data
Sheet (TA201348).
▪
Link the Wallbus Interface module’s inputs and outputs
to the required modules in the strategy.
For details of the Wallbus Network and Wallbus Interface
modules see the IQ4 Configuration Manual (TE201263).
The controller strategy must be configured using SET v7.0 or greater. For details of using SET - see the SET Manual
(TE200147).
For IQeco
I/Omodule 2 must be set up with WMB display type. Its
channels are connected to external sensors with scaling type
‘112, WMB pre-scaled’ as follows:
Channel 1: Temperature
Channel 2: Humidity*
Channel 3: Dew point*
*Humidity and Dew point on -H, CO
2
on -C versions only
The fan can operate in one of seven modes, this is set in I/O
module 2, Fan Configuration parameter (f). It is set up in the
RD by the controller on power up.
Mode Description
0
no fan
1
2 position fan (OFF, ON)
2
3 position fan (OFF, ON, AUTO)
3
4 position fan (Off, 1, 2, 3)
4
5 position fan (Off, 1, 2, 3, AUTO)
5
4 position blind
6
5 position blind.
The strategy must comply with the following module mappings
between strategy and RS-WMB, RD-WMB .
Setpoint
K44 Input to/output from RD
Occupation Override
W1 Input to/output from RD
Occupation Status
S10 Input to RD
Fan Speed
K45 Input to/output from RD
Room Temperature
S31 Input to RS-WMB, RD-WMB
Humidity Display
S32 Input to RD
CO
2
Concentration
Display
S34 Input to RD
Outside Temperature
Display
S30 Input to RD
Note: RS-WMB needs S31 only (to define temperature
units,°C or °F)