5
U
NPACKING AND
I
NSTALLATION
This chapter provides unpacking and setup information for the Switch.
Unpacking
Open the shipping cartons and carefully unpacks its contents. The
carton should contain the following items:
One the 16-port 10/100M NWay Fast Ethernet Switch
One AC power cord; suitable for your area’s electrical power
connections
Four rubber feet to be used for shock cushioning
Screws and two mounting brackets
This User’s Guide
If any item is found missing or damaged, please contact your local
reseller for replacement.
Installation
The site where you install the Switch may greatly affect its
performance. When installing, consider the following pointers:
??
Install the Switch in a fairly cool and dry place. See
Technical Specification
for the acceptable operating
temperature and humidity ranges.
??
Install the Switch in a site free from strong electromagnetic
source, vibration, dust, and direct sunlight.
??
Leave at least 10cm of space at the left and right hand side of
the Switch for ventilation.