23
3-6 FUNNEL REPLACEMENT
If it is necessary to change the funnel due to a different contact
gauge, perform the following steps:
Step 1. Open the sleeve valve.
Step 2. Remove the two screws securing the funnel cover plate.
Step 3. Remove the funnel cover plate.
Step 4. Remove the 2 each screws from each of the funnel halves.
Step 5. Remove the funnel halves.
Step 6. Install the new funnel halves using the screws removed in
the Step 4
NOTE
Either funnel half may be used in either position,
as they are self-aligning
.
3-7
DROP TUBE TRANSFER TIP REPLACEMENT
If it is necessary to change or replace the drop tube or transfer tip
after initial
set-up, refer to paragraph 3-3 for instructions.
Summary of Contents for PORTA TAC E Series
Page 7: ...7 FIGURE 1 1 PORTA TAC CRIMPER FRONT VIEW ...
Page 8: ...8 FIGURE 1 2 PORTA TAC CRIMPER WITH MAGAZINE ...
Page 9: ...9 FIGURE 1 3 PORTA TAC CRIMPER SIDE VIEW ...
Page 11: ...11 ...
Page 17: ...17 ...
Page 26: ...26 FIGURE 4 1 CRIMP CYLINDER ARBOR OPEN ARBOR COVER PLATE REMOVED ...
Page 27: ...27 FIGURE 4 1 CRIMP CYLINDER ARBOR CLOSED ARBOR COVER PLATE REMOVED ...
Page 30: ...30 FIGURE 4 3 CRIMP INSPECTION POINTS ...
Page 31: ...31 FIGURE 4 4 IMPROPER CRIMPS ...
Page 32: ...32 ...
Page 40: ...40 FIGURE 6 1 PANEL COMPONENTS ...
Page 41: ...41 FIGURE 6 2 CABINET COMPONENTS TRANSFER MECHANISM ...
Page 44: ...44 FIGURE 6 3 INDENTER SYSTEM REPLACEMENT ...
Page 45: ...45 ...
Page 46: ...46 FIGURE 6 5 INDENTER REPLACEMENT ...
Page 50: ...50 ...
Page 53: ...53 ...