Page 18
Step 3.
Depress First Part switch to load first contact
Step 4.
Open the funnel and observe if a contact is present. If contact is
present, let the funnel close and proceed to Step
5. If no contact is present, repeat Step 3
Step 5.
Obtain a properly stripped conductor Select the proper "G" dimension
setting. See Table 4-1.
TABLE 4-1. EXTERNAL "G" SELECTIONS.
SETTING # = WIRE SIZE #
For 22 gauge contacts:
1 =
26 AWG
2 =
24 AWG
3 = 22 AWG
For 20 gauge contacts:
4 = 24 AWG
5 =
22 AWG
6 =
20 AWG
“G” Selector
Contacts loading in feed tube are controlled by Feed Tube Sensor. If
feed tube is full, the sensor detects, and shuts off feeder bowl. As feeder
tube empties, sensor detects and feeder bowl is turned back on.
Summary of Contents for TAC-10X
Page 5: ...Page 5 Figure 1 1 TAC 10X Front View ...
Page 7: ...Page 7 Figure 1 2 Wire Insertion Through Funnel ...
Page 10: ...Page 10 Figure 2 1 Pneumatic Hook Ups Air Off Air On ...
Page 16: ...Page 16 Crimp Inspection Points Improper Crimps Figure 3 3 Crimped Samples ...
Page 24: ...Page 24 Figure 6 1 TAC 10X Pneumatic Control Panel ...
Page 25: ...Page 25 Figure 6 2 TAC 10X Components Right View ...
Page 26: ...Page 26 PLC Controller Switching Power Supply Figure 6 3 TAC 10X Components Left View ...
Page 30: ...Page 30 ...
Page 31: ...Page 31 Carefully Remove Hose Clamp ...
Page 34: ...Page 34 ...
Page 38: ...Page 38 Figure 7 3 TAC 10X Pneumatic Diagram ...