Step 21.
Crimp the conductor.
Step 22.
Inspect the crimp per required specifications.
Step 23.
Repeat Steps 19 through 22 for each conductor wire gauge to obtain
the necessary specimens; inspect per established procedure.
Step 24.
After all specimens have been produced, set the power on-off switch to
off and open the sleeve valve.
Step 25.
If crimps meet all established parameters, certify the TAC-10X for
production use, and establish a periodic verification schedule.
Summary of Contents for TAC-10X
Page 5: ...Page 5 Figure 1 1 TAC 10X Front View ...
Page 7: ...Page 7 Figure 1 2 Wire Insertion Through Funnel ...
Page 10: ...Page 10 Figure 2 1 Pneumatic Hook Ups Air Off Air On ...
Page 16: ...Page 16 Crimp Inspection Points Improper Crimps Figure 3 3 Crimped Samples ...
Page 24: ...Page 24 Figure 6 1 TAC 10X Pneumatic Control Panel ...
Page 25: ...Page 25 Figure 6 2 TAC 10X Components Right View ...
Page 26: ...Page 26 PLC Controller Switching Power Supply Figure 6 3 TAC 10X Components Left View ...
Page 30: ...Page 30 ...
Page 31: ...Page 31 Carefully Remove Hose Clamp ...
Page 34: ...Page 34 ...
Page 38: ...Page 38 Figure 7 3 TAC 10X Pneumatic Diagram ...