Page 43
Step 21.
Crimp the conductor.
Step 22.
Inspect the crimp per required specifications.
Step 23.
Repeat Steps 19 through 22 for each conductor wire gauge to obtain
the necessary specimens; inspect per established procedure.
Step 24.
After all specimens have been produced, set the power on-off switch to
off and open the sleeve valve.
Step 25.
If crimps meet all established parameters, certify the TAC-17X for
production use, and establish a periodic verification schedule.
Summary of Contents for TAC 17X
Page 5: ...Page 5 Figure 1 1 TAC 17X Front View ...
Page 7: ...Page 7 Figure 1 2 Wire Insertion Through Funnel ...
Page 10: ...Page 10 Primary air input at rear of TAC Figure 2 1 Pneumatic Hook Ups ...
Page 16: ...Page 16 Crimp Inspection Points Improper Crimps Figure 3 3 Crimped Samples ...
Page 25: ...Page 25 Figure 6 1 TAC 17X Pneumatic Control Panel ...
Page 26: ...Page 26 Figure 6 2 TAC 17X Components Right View ...
Page 38: ...Page 38 ...
Page 39: ...Page 39 Carefully Remove Hose Clamp ...
Page 42: ...Page 42 ...
Page 47: ...Page 47 Figure 7 3 TAC 17X Pneumatic Diagram ...