background image

 

22 

 

 

Petrol or diesel 

 

Pesticides   

Acceptable in normal conditions and usage. Excess amounts of biological detergent can 

affect the biomass development. If you have to use an unusual amount, it may be a good 

idea to spread it over a few days. 

o

 

In applications that produce large volumes of grease (e.g. commercial kitchens) it is 

advised that a suitably sized grease trap is installed and maintained effectively to ensure 

the  correct operation of the Tricel Puraflo system. Fats or grease present in the system 

will greatly reduce the operating efficiency of the system and will greatly reduce the life 

expectancy of the peat fibre.  

o

 

Generally speaking, all common household cleaning fluids are acceptable, provided they 

are used in accordance with the maker’s instructions and stipulated concentrations. 

 

 

Do not allow any of the following to enter the Tricel Puraflo system: 

 

Large quantities of milk, alcohol or food 

 

Large quantities of bleaches or cleaners 

 

Baby wipes, cosmetic and cleaning wipes 

 

Sanitary towels 

 

Tampons 

 

Kitchen paper 

 

Nappies 

 

Medication 
 

 

Service personnel must be accommodated with clear access to the system. 

 

If others size the system,  we will supply to these specifications. In this case, the 
responsibility lies with others in relation to the maximum flow/litres per day, the system 
capacity and retention times. Similarly, if we size the system and a greater load is placed on 
the system by the addition of extra houses, bedrooms, schools, crèche’s etc., or by other 
means, we are not responsible for the system in terms of overloading or quality of effluent 
as the retention times may be compromised. 

 

The modules are not suitable for vehicular traffic. We also recommend fencing off the area 
to prevent livestock herds from accessing the system. 

 

There must be no load placed on the lids of the Puraflo modules and the lids must not be 
covered. 

 

There must be no vegetation planted in the ground adjacent to the Puraflo modules. 

 

In the event that a non-Tricel approved installer is installing the system, please ensure that 
the installer has the required skills and knowledge to ensure that the system is installed 
correctly. 

 

 

 

 

 

 

Summary of Contents for 11P Puraflo Secondary

Page 1: ...1 125 Rev 4 Jan 2019 Tricel Puraflo 1 50 Wastewater Treatment Plants Engineering a green future...

Page 2: ...eatment 11 3 Tricel Puraflo Range 12 3 1 System Specifications 12 3 2 System Components 12 3 2 1 Tricel Puraflo Module 12 3 2 2 Effluent Filter secondary treatment only 13 3 2 3 Pump 13 3 2 4 Pipework...

Page 3: ...Conditions 21 10 Troubleshooting 23 10 1 Plant Operation 23 10 2 Odours 24 11 Certification 25 11 1 Declaration of Performance Tricel Puraflo with Tricel Fortis 25 11 2 Declaration of Performance Tric...

Page 4: ...4...

Page 5: ...5...

Page 6: ...e wastewater treatment system must be appropriately trained Suitable protective clothing including waterproof abrasion resistantgloves overalls safety footwear eye ear and respiratory protection goggl...

Page 7: ...hende sludgingand thereforethisshallneverbe donealone A wastewater treatment system that fails to fully treat sewage due to poor maintenance or overloading may allow excess nutrients phosphorus and ni...

Page 8: ...using little to no energy The Tricel Puraflo system works in conjunction with your septic tank or wastewater treatment plant The wastewater is distributed evenly over the top of the peat filter using...

Page 9: ...evenly onto the peat filter via a distribution grid at the top of each Puraflo module Stage 3 Liquid effluent undergoes treatment as it filters through the bio fibrous peat in the Puraflo modules Stag...

Page 10: ...er of modules depend on loadings 7 Sampling Chamber 8 DistributionBox Flowing topercolationarea pumpchambertodischarge treated liquid Some septic tanks may only have one manhole cover 2 2 2 Plan view...

Page 11: ...tank a pumping chamber with control alarm kiosk as well as the Puraflo modules with a sampling chamber 2 3 2 Tertiary Treatment Environmentally sensitive sites or sites that are restricted in terms o...

Page 12: ...2 7 9 1 3 3 10 11 1 4 4 12 15 3 2 6 16 21 4 2 8 22 24 3 3 9 25 27 5 2 10 28 33 6 2 12 34 42 5 3 15 43 45 4 4 16 46 50 6 3 18 3 2 System Components 3 2 1 Tricel Puraflo Module Dimension Unit Value A m...

Page 13: ...hose over the septic tank 3 2 3 Pump The submersible pump and float switch is fitted with a thermal overload protection Effluent from the septic tank or waste water treatment is pumped via a 1 5inch p...

Page 14: ...ted wastewater from the Puraflo modules and the pipeworkusedforthedispersion of wastewater on top of the peat inside the Puraflo modules is in accordancewithBS3505 1986 Specification for unplasticized...

Page 15: ...15 Important If you required drawings for larger Tricel Puraflo systems from 12 to 50PE please visit http ie tricel eu downloads...

Page 16: ...re ropes in contact with the modules Care is needed to control the lift to ensure the modules are not damaged The modules are designed for a single lift when placing them in position Always lift modul...

Page 17: ...result in reduced effectiveness and increased maintenance and orreplacementcostsinthelong term 8 1 Regular Maintenance 8 1 1 Septic Tank If applicable Theseptictankshouldbede sludgedwhenrequired Inacc...

Page 18: ...lter over the septic tank ensuring that all solids fall back into the septic tank Insert the filter cartridge back into the housing ensuring that the filter is properly aligned and inserted correctly...

Page 19: ...relation to the pump o Intheeventofanelectricalstormorpowerfailure thecircuit breakerswitchesoff theelectrical linesfeedingthepump The pump alarmshouldbecheckedtoseeif they tripped to the off positio...

Page 20: ...the septic tank primary storage chamber is measured The system is inspected for any obvious non wastewater infiltration into any compartment at the time of inspection The effluent filter in the septi...

Page 21: ...e done as soon as possible An electrical connection to the plant must be maintained for it to function correctly This ensures that theplanthasacontinuousairsupplyandwherenecessarythedischargepumpwill...

Page 22: ...meticandcleaningwipes Sanitarytowels Tampons Kitchenpaper Nappies Medication Servicepersonnelmustbeaccommodatedwithclearaccesstothesystem If others size the system we will supply to these specificatio...

Page 23: ...move freely Storm water flooding Redirect storm water drains Storm water must never enter the plant Discharge hose pipe blocked Find blockage and remove or replace damaged hose pipe Pump runs intermi...

Page 24: ...in the drains are fitted and the joints sealed Air vent on pipe work not installed correctly Ensure all effluent pipes are vented correctly Vents are normally fitted to all pipes and they should be h...

Page 25: ...RP Technology Septic tank with bio fibrous peat filter Components Septic tank Pump chamber bio fibrous peat modules alarm 4 Intended for Use To treat domestic wastewater for up to 50 population equiva...

Page 26: ...ad of 0 33kg d and hydraulic daily load of 0 9m 3 d Determined at temperatures 12 0 Material Performance Essential Characteristics Method Performance Harmonised Technical Specification Water Tightness...

Page 27: ...r finstitut f r Abwassertechnik GmbH Hergenrather Weg 30 52074 Aachen Number NB 1739 Treatment design capacity Nominal organic daily load BOD5 Nominal Hydraulic daily flow QN As Set Out in Table CE fo...

Page 28: ...s peat modules alarm 4 Intended for Use To treat domestic wastewater for up to 50 population equivalent 5 Name Address and Contact Information of Manufacturer Tricel Killarney Unlimited Company tradin...

Page 29: ...s obtained at average organic daily load of 0 33kg d and hydraulic daily load of 0 9m 3 d Determined at temperatures 12 0 Material Performance Essential Characteristics Method Performance Harmonised T...

Page 30: ...rance Number NB 1164 Puraflo Notified Body Pr finstitut f r Abwassertechnik GmbH PIA Hergenrather Weg 30 52074 Aachen Germany Number NB 1739 Treatment design capacity Nominal organic daily load BOD5 N...

Page 31: ...31...

Page 32: ...Puraflo Tertiary 221361 1 62 4050 33P Puraflo Secondary 221349 1 98 4950 33P Puraflo Tertiary 221362 1 98 4950 42P Puraflo Secondary 221350 2 52 6300 42P Puraflo Tertiary 221363 2 52 6300 45P Puraflo...

Reviews: