Important
●
Before connecting the machine to new pipework or
to pipework that has not been used for some time,
run off a reasonable amount of water to flush out any
debris that may have collected in the pipes.
●
For a correct functioning of the machine the drain
hose must be hooked on the proper support piece
situated on the top of the back side of the appliance.
Levelling
Level the washing machine by raising or lowering the
feet. The feet may be tight to adjust as they incorporate
a self locking nut, but the machine MUST be level and
stable (check diagonally).
Any necessary adjustment can be made with a spanner.
Accurate levelling prevents vibration, noise and
displacement of the machine during operation.
Some vibration is inevitable, especially if mounted on a
wooden floor.
Sprung wooden floors are particularly susceptible to
vibration. For advice, consult a builder. If possible,
always place the machine on a solid floor.
P1051
P119
8
Loop
Special conditions
If the floor is carpeted or covered with crumbly or soft
material, insert a rigid support base under the feet to
prevent noise, vibration or displacement. The base
should protrude a few centimetres beyond the edges of
the machine.
Warning
The machine should NOT be placed on deep pile
carpeting.
Note
Please ensure that when the appliance is installed it is
easily accessible for the engineer in the event of a
breakdown.
In the interest of the environment
Washing machines and dishwashers should be
connected to the FOUL drainage system, the water will
then be taken to a sewage works for treatment before
being discharged safely into a river.
It is essential that these appliances are not connected to
the surface water drainage system as this water is
discharged directly into a river or stream and may cause
pollution.
If you require any further advice please contact your
local water authority.
SHOWER
BATH
SINK TOILET
BIDET
WASHING
MACHINE
DISHWASHER
RAINWATER
'RUN-OFF'
SURFACE WATER
DRAINS & SEWERS
UNTREATED
DISCHARGE
RIVER
FOUL DRAIN
FOUL SEWERS
SEWAGE
TREATMENT
WORKS
RIVER
P09
8
7
TREATED
DISCHARGE