5.4 Schedule (SDL)
x-touchBOX/PANEL
5 Basic application
5.4
Schedule (SDL)
A schedule comprises the time between 0:00:00 and 23:59:59. A schedule is a defined sequence
of scenes and sequences. A schedule can be started manually or it can start automatically within
an activated schedule list. x-touchBOX/PANEL can save up to 7 schedules, i.e. no more than one
schedule for each weekday.
Depending on the application, you can use scenes and sequences several times and in any order
in a schedule. The duration of the sequences is visualized by the marker flags on the timeline.
To define a schedule, the following operating elements are available:
Element
Meaning/Function
The schedule number (SDL1) is set at the factory, the name
(Schedule 1) can be assigned as desired.
Use the arrow keys to select the sequences and scenes you want to
include in the timeline. After
S16
the marker
Off
is displayed. The
marker
Off
ends a scene, sequence or schedule and can be set
several times.
Use this button to remove the selected scene or sequence from the
schedule.
The timeline visualizes:
- The complete schedule (0:00 to 23:59 )
- The start of a scene/sequence
- The duration of a scene/sequence
- The end of a scene/sequence
- The intervals between scenes/sequences
Use the arrow keys to move the visible section of the timeline.
Use the magnifier to scale the timeline section up or down.
The
Folder
button opens the dialog box
Load schedule
.
The
Save
button opens the dialog box
Save schedule
. The current
settings are saved in the desired schedule.
Hint
If a Sequence, Schedule or Schedule list is started in the Scheduler, the currently enabled function
(Sequence, Schedule, Schedule list) is terminated.