Trina Solar User Manual | Vertex Series Modules
9
5.2 UNPACKING STEPS
Method A
: Unpacking from one side for DE18M(II) / DE18M.08(II) / DEG18MC.20(II) / DE19 /
DEG19C.20 series modules with vertical landscape package.
Method B
: Unpacking for DE18M(II) / DE18M.08(II) / DEG18MC.20(II) / DE19 / DEG19C.20 series
modules with vertical landscape package.
1) Place the carton box on a flat
ground, then cut the packing
belts. Start from step 3 if there
are no plywood attached.
2) Remove the attached plywood.
3) Prepare for unpacking (do
not stack the module),
unpacking instruction can be
seen on the packing box.
4) Cut the two packing belts
on the short side of the pallet,
and cut the side carton in the
vertical direction.
5) Cut off the short-side tape, lift
the cardboard up 90°, and pull
out the cardboard to expose the
modules.
6) Cut the two horizontal packing
belts inside the carton, and cut the
two packing belts near the pallet.
Take out the modules in turn and
carry the module by two people.
1) Remove the wrapping film
and packing belts.
2) Remove the top cover and
the cartons.
4) Cut off all the horizontal
packing belts.
5) When there are 1-2 vertical
packing belts remaining, push
the module gently to tilt toward
the stand supporter.
6) Cut off the remaining
packing belts.
7) Take out the modules in
order.