16
The following installation methods and mechanical loads have been verified by the Trina
Solar’s
National Key Laboratory for PV Science and Technology.
Module type
Maximum loads
Module type
Maximum loads
Use 4 clamps on the short side.
Mounting rails run perpendicular to the long side frame.
Use 4 clamps on the short side.
DE09
DE09.05
DE09.08
A = (0 - 200) mm
Uplift load ≤ 2000 Pa
Downforce load ≤ 2400 Pa
DE09
DE09.05
DE09.08
A = (0 - 200) mm
Uplift load ≤ 1800 Pa
Downforce load ≤ 2400 Pa
DE18M(II)
DE18M.08(II)
A = (0 - 200) mm
Uplift load ≤ 1000 Pa
Downforce load ≤ 1200 Pa
DE18M(II)
DE18M.08(II)
DEG18MC.20(II)
A = (0 - 200) mm
Uplift load ≤ 1000 Pa
Downforce load ≤ 1300 Pa
DEG18MC.20(II)
A = (0 - 200) mm
Uplift load ≤ 1000 Pa
Downforce load ≤ 1300 Pa
Use 4 clamps on the long side.
Use 6 clamps on the long side.
DE09
DE09.05
DE09.08
A = (200 - 400) mm
Uplift load ≤ 3000 Pa
Downforce load ≤ 3600 Pa
A = (100 - 200
or 400 - 500) mm
Uplift load ≤ 2000 Pa
Downforce load ≤ 2400 Pa
DE09
DE09.05
DE09.08
A = (0 - 200) mm
B = (0 - 200) mm
Uplift load ≤ 2400 Pa
Downforce load ≤ 3600 Pa
DE18M(II)
DE18M.08(II)
DEG18MC.20(II)
A = (200 -
600
) mm
Uplift load ≤ 1700 Pa
Downforce load ≤ 1700 Pa
DE18M(II)
DE18M.08(II)
A = (0 - 200) mm
B = (0 - 200) mm
Uplift load ≤ 1800 Pa
Downforce load ≤ 2400 Pa