background image

APMEA

China
Changzhou

Corporate Headquarters

No. 2 Tianhe Road, Trina PV
Industrial Park, New District,
Changzhou, Jiangsu, 213031
T   + 86  519  8548  2008
f   + 86  519  8517  6021
e   sales@trinasolar.com

Shanghai

333 North Caoxi Road
CCIG International Plaza
Building B, Offices 1704-1706
Shanghai 200030
 e   sales@trinasolar.com

Beijing

48 Dongzhimenwai Street
Oriental Kenzo Office Building,
X-17KL, Dongcheng District,
Beijing 100027
T   + 86  10  5817  4080
f   + 86  10  5817  4020
e   sales_china@trinasolar.com

Singapore
Trina Solar (Singapore) Pte Ltd

Three Temasek Avenue
#16-03 Centennial Tower
Singapore 039190
T  + 65 6808 1111
f    + 65 6835 7225

Korea
Trina Solar Korea Ltd

B1-140, Daewoo Dovile 117
Hap-dong Seodaemun-gu
120-030 Seoul 
T   02  392 1588
f   02  362  8820
e   korea@trinasolar.com

Japan
Trina Solar (Japan) Limited

World Trade Center Building
33rd floor, 4-1 2-Chome
Hamamatsu-cho Minato-ku,
Tokyo 105-6133
T   + 81  3  3437  7000
f   + 81  3  3437  7001
e   japan@trinasolar.com

Malaysia
Trina Solar (Malaysia) SDN. BHD.

Plot 201, Lebuhraya Kampung Jawa
Bayan Lepas fTZ, Phase 3, 11900
Pulau Pinang
T   + 60 4685 2008

Australia
Trina Solar (Australia) Pty Ltd

Macquarie House
LeVeL 13, Office Number 1315
167 Macquarie Street
Sydney NSW 2000
T   + 61  2  8667  3088
f   + 61  2  8667  3200
e   australia@trinasolar.com

United Arab Emirates
Trina Solar Middle East Ltd

Office #306, Injazat Building,
Mohamed Bin Zayed City,
Abu Dhabi,
P.O Box 135084
T   + 971  562047969
e   uae@trinasolar.com

Europe

Switzerland

European Headquarters
Trina Solar (Schweiz) AG

Richtistraße 11
8304 Wallisellen Schweiz
T   + 41  43  299  6800
f   + 41  43  299  68 10
e   europe@trinasolar.com

Germany
Trina Solar (Germany) GmbH

einsteinring 26,
D-85609 Aschheim/München,
T   + 49  89  122  8492  50
f   + 49  89  122  8492  51
e   germany@trinasolar.com

Italy
Trina Solar (Italy) Srl

Via Santa Maria Valle 3
20123 Milan
T   + 39  02  0068 1521
f   + 39  02  0068 1400
e   italy@trinasolar.com

Spain
Trina Solar (Spain) Slu

Paseo de la Castellana 141,
8th floor,
28046 Madrid,
T   + 34  91  572  6576
f   + 34  91  572  6621
e   spain@trinasolar.com

United Kingdom
Trina Solar (UK) Ltd

Regus east Midlands Airport
Pegasus Business Park
Herald Way, Castle Donington
Leicestershire
De74 2TZ
T   + 44  1332 638 700
f    + 44  1332 638 160

France
Trina Solar (France) SAS

21 Avenue Georges Pompidou
69486 Lyon Cedex 03
T    + 33 (0)4 72 91 30 00
f    + 33 (0)4 72 91 30 30

North America

United States
Trina Solar (U.S.) Inc

100 Century Center, Suite 340,
San Jose CA 95112,
USA
T   + 1  800  696  7114
f   + 1  800  696  0166
e   usa@trinasolar.com

For more info

www.trinasolar.com

APMeA refers to Asia Pacific, Middle east and Africa

Optimized by

Summary of Contents for Trinasmart

Page 1: ...Installation and Safety Manual TSM_Trinasmart_Installation and Safety Manual_2012_RevB...

Page 2: ...2 Installation and Safety Manual Trinasmart 3simple steps 1 Configure the System Before Going to the Site 2 Install the Management Unit and Gateway 3 Install the Optimizers and verify system...

Page 3: ...ng the Management Unit and Gateway 15 Verifying the System 17 Troubleshooting 23 Technical Specifications 25 per UL 1741 This symbol is used to indicate WARNING Failure to follow instructions may resu...

Page 4: ...PV module with or without the Trinasmart Optimizer attached Installation must be performed by trained professionals only Trina Solar does not assume liability for loss or damage resulting from imprope...

Page 5: ...nal management and performance monitoring In well designed large scale systems Trinasmart Optimizer systems will return up to 8 incremental power output while in residential or commercial systems with...

Page 6: ...the MMU will display PVSAFE PRESSED and Requesting to indicate the command has been sent to the Optimizers As the Optimizers are responding the MMU display will indicate how many have successfully dis...

Page 7: ...user ID password information if already established Installation schematic drawing Phillips and slotted screwdrivers MC4 type connectors 1 male 1 female per string Permanent marker or label maker Dete...

Page 8: ...8 Installation and Safety Manual Trinasmart IDENTIFYING PARTS OF THE TRINASMART OPTIMIZER SYSTEM Trinasmart Module Optimizer MM ES Gateway Management Unit MMU and Gateway cable...

Page 9: ...the Mac IDs from the Optimizers ready before beginning the configuration process Optimizer codes can be found on the outside of the box this is not recommended if box has been opened All identificati...

Page 10: ...wisted pair outdoor rated wire of at least 18AWG See Tigo Energy s website for a list of tested cable options Access the MMU communications ports by pressing the latch at the bottom edge of the clear...

Page 11: ...ight four pin connector in order to wire the outbound RS 485 cable to the next Gateway Only the final Gateway in the series connection should have a termination resistor When finished replace the cove...

Page 12: ...cuit do not use a separate or dedicated power supply DO NOT INITIATE DISCOVERY AND POWER ON UNTIL ALL OPTIMIZERS HAVE BEEN INSTALLED NOTE To verify if a connection has been made to the network the ins...

Page 13: ...ub Array 1 Sub Array 2 Sub Array 4 Sub Array 3 Gateway Gateway Terminated Gateway Position the Gateway at the center of the module cluster and attach to the upper left hand corner of a PV module frame...

Page 14: ...the modules from the Management Unit console Place this label in a visible location on the front surface of the Fuse Combiner Box typically found adjacent to the array in multi string projects AC Disc...

Page 15: ...modules return to the Management Unit and initiate the Discovery and Power On command which will also power on the Optimizers if they not powered on already Access this from the MMU display by selecti...

Page 16: ...communicate effectively with the Gateway By paying close attention to these warning messages the installer can locate the most ideal place for the Gateway to be able to communicate effectively with al...

Page 17: ...andard PV array Refer to the Troubleshooting section for instructions on verifying the system communication is operating properly Please ensure safety precautions are always observed in order to avoid...

Page 18: ...off 3 Push Data Immediately attempts to make another communication to transfer data to the data center without having to wait the usual 10 minute period between communications Useful for real time deb...

Page 19: ...ion can be wired with Cat 5 Ethernet wire The data feed leads A and B on the MMU and Gateway terminal blocks must be connected to the same twisted pair See the table for instructions on connecting the...

Page 20: ...e Gateway This is useful for troubleshooting problems with the system communications See the table below for the meaning of each light pattern Color pattern Gateway Status No color Not powered from MM...

Page 21: ...ccess the web via HTTPS proxy and server is not cooperating Verify proxy settings on MMU Verify proxy server allows access to https datacenter tigoenergy com Re initiate network test No default GW Mis...

Page 22: ...ressing ENTER 4 The next entry field will read SUBNET MASK AND AGAIN 000 000 000 000 Use the four keys as before to move and change the number values 5 The next entry field will read DEFAULT GATEWAY A...

Page 23: ...d if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular in...

Page 24: ...nt of ISC 0 053 C Input data MMJ ES50 Maximum Power 300W Maximum Input DC Voltage VOC 52V VMP Range 16 48V Maximum Continuous Current IMP 9 5A Maximum Input Current ISC 10A VMP Voltage at maximum powe...

Page 25: ...ie Street Sydney NSW 2000 t 61 2 8667 3088 f 61 2 8667 3200 e australia trinasolar com United Arab Emirates Trina Solar Middle East Ltd Office 306 Injazat Building Mohamed Bin Zayed City Abu Dhabi P O...

Reviews: