background image

 

TrinityHighway.com

 

Created July 2021

 

2001MB Removal 

1.  Loosen Fill Caps to facilitate water removal. 

2.  Remove the Drain Plug at the base of the barricade and drain water completely. 

3.  After the barricade is empty, attach Drain Plug, Fill Cap, and remove Interlocking Coupler. 

4.  Empty barricades can now be removed for transport and storage. 

Optional Corner Connector Removal 

1.  Remove the Interlocking Coupler from both sides of the Corner Connector. 

2.  Slide the Corner Connector away from each barricade run. 

3.  The Corner Connector can now be removed for transport and storage. 

 

 

Corner 

Hinge Plug 

Connector

 

Pin

 

Hinge 

Corner Connector 

Summary of Contents for Yodock 2001MB

Page 1: ...eimbursement as a MASH 16 TL 2 LCD on the National Highway System NHS FAILURE TO FOLLOW INSTRUCTIONS MAY RESULT IN PROPERTY DAMAGE OR CAUSE SERIOUS INJURY TO PEDESTRIANS AND VEHICLE OCCUPANTS 4 5 3 1 2 Features 1 Interlocking Coupler 2 Light Box Recess 3 Fill Cap Port 4 Drain Hole Plug 5 Forklift Ports Specifications 6 length 18 width 32 height Empty Weight 85 lbs Full Weight 900 lbs Capacity 100 ...

Page 2: ...Barricades NOTE It is not required to fill the Corner Connector with water 4 Ensure that all Drain Plugs are properly secured 5 If not already done remove one or both Fill Caps 6 Fill each 2001MB with water to the bottom of the forklift ports approximately 60 gallons 7 Attach Fill Caps to prevent water loss and to keep debris out of the barricade 1 The LCD may be placed on cross slopes up to 5 3 F...

Page 3: ... attach Drain Plug Fill Cap and remove Interlocking Coupler 4 Empty barricades can now be removed for transport and storage Optional Corner Connector Removal 1 Remove the Interlocking Coupler from both sides of the Corner Connector 2 Slide the Corner Connector away from each barricade run 3 The Corner Connector can now be removed for transport and storage Corner Hinge Plug Connector Pin Hinge Corn...

Page 4: ...op of the barricade and place the Fence Panel Posts into the Fill Holes The posts should seat firmly within the post boots at the base of the barricade with the Rubber Grommets snug in the fill holes at the top of the barricade The chain link mesh should be faced out from the barricade 7 Interconnect the Fence Panels using two 2 Fence Panel Clamps each one approximately 12 from the top and bottom ...

Page 5: ...ransport and storage Cold Weather Environments and Anti Freeze Recommendations 1 Choose the level of freeze point protection anticipated 2 Choose your anti freeze agent from the charts below 3 Use the appropriate anti freeze agent for your location when filling the 2001MB Note The two charts are for reference only and do not guarantee freeze prevention 1 If a spill occurs with a mixture that is sl...

Reviews: