www.energyabsorption.com
Revision B June 2013
www.highwayguardrail.com
39
All rights in copyright reserved
12)
Verify Position of Hydraulic / Electrical Lines
Check the location of all the hydraulic and electrical lines to make sure they will not be
damaged during the folding and unfolding of the system.
13)
Check System Lights for Proper Operation
Verify that all the turn / stop / tail / reverse lights are working properly. Replace any
bulbs that are out
.
There are two light circuits on the TMA. Verify both circuits are operational.
Raise the system to folded position and verify secondary lights are working.
With the system unfolded, lights on the Impact Face will be on and lights on the Mid
Frame will be off.
With the system folded, the lights on the Mid Frame will be on and the lights on the
Impact Face will be off.
14) Final
check
Check the tightness of all the fasteners. Check all steel cables to verify that they are
properly attached and tightened.
15)
Ready to Use
The system is now ready for use.