25
Triple Solar assembly instruction PVT heat pump panels UK January 2021
9. Finishing
Pitched roof
–
pipe clamps and cover plate
1. Where the pipe clamps are to be installed, loosen the end clamps and the hammer head
bolt used. Slide the hammer head bolt into the pipe clamp.
2. Slide the tube clamp over the end of the mounting rails.
Figure 9.1-a Mounting the pipe clamp
3. Reinstall the end clamp in combination with the pipe clamp holder and the mounting rail.
The cut-out should again fall over the ridge in the panel.
Figure 9.1-b Mounting the end clamps on the pipe clamps
4. Once the pipes are resting on the lower part of the pipe clamps, they are clamped with the
top of the pipe clamp and the supplied self-tapping screw 6.5x75 Stainless steel.