Power Up
– System Switch On
Switch ON & Start-Up Sequence
When all connections have successfully been made to both the surface & subsea equipment as per the
manual sections ‘System Connections – SUBSEA’ & ‘System Connections – SURFACE’ the equipment can
then be powered ON.
Powering should be initiated in the following sequence:
Power On the ‘TOUGHBOOK’ Laptop
(Laptop can be powered via its own internal Lithium battery or connected to a mains supply
using its dedicated charging adapter PSU)
Once the laptop has ‘booted’ to the desktop double click the Genesis (DMD) shortcut to launch the
system software
The Genesis version splash screen will appear briefly followed by a plain Grey screen as seen
below
IMPORTANT
– If the DMD SCU Air
transportation fuses were previously
removed for shipping purposes then
these must be re-fitted. If not fitted the
SCU will be unable to supply power via
the Diver Cable to the SSC