A
Q U A S E N S A T I O N
A S 2 0 0 0 T / A S 2 0 0 0
10
FITTING THE SHOWER TO THE WALL
Important:
Prior to fitting the shower, ensure
plumbing is flushed out, removing all debris, flux
etc.
For top pipe entry or top cable entry, remove the
relevant cut-outs by either breaking out or by
using a knife or junior hack saw
(fig.14)
.
If top entry for both pipe and cable is required,
then additionally remove the shaded area
(fig.14)
by using a knife or junior hacksaw.
For bottom pipe entry, remove the cut-out and
break off the two circular parts
(fig.15)
. Replace
the cut-out.
For rear pipe entry only, the supplied elbows must
be used with the necessary portion of backplate
cut away as shown in
fig.9
.
It will be necessary if rear cable entry is required,
for conduit or other routing of the electrical cable
to be completed before fixing the shower to the
wall.
Offer the backplate unit up to the completed
pipework and manoeuvre so that the end of the
pipes enter fully into the inlet fittings.
Mark positions for wall fixing holes using
backplate as template
(fig.16)
. Note that four
fixing holes are provided but using only two
should be adequate for most site conditions.
Using the pipe removal tool supplied, push back
and hold the collects from the pipework
(fig.17)
in order to disengage pipework from the inlet
elbows.
Remove unit from the wall.
Drill and plug the fixing holes to suit the type of
wall and fixing screws supplied. NOTE: If fitting
rising supplies to the unit, ensure debris does not
enter the pipes when drilling the wall.
Offer the back plate unit up to the completed
pipework and manoeuvre so that the end of the
pipes enter fully into the inlet fittings.
Check the backplate is square and the fixing holes
are aligned
(fig.16)
.
Secure to the wall with fixing screws supplied.
Remove shaded area
Cut out
for cable
DISCONNECT FROM
ELECTRICITY SUPPLY
BEFORE REMOVING
THIS COVER
DISCONNECT FROM
ELECTRICITY SUPPLY
BEFORE REMOVING
THIS COVER
Fig.14
Fig.15
Fig.16
Summary of Contents for Aquasensation AS2000
Page 28: ...UKAS QUALITY MANAGEMENT 003 ...