COMMISSIONING
WARNING: Before normal operation of the
shower, it is essential that the commissioning
and setup procedure are correctly completed.
Failure to do so could cause the pump to run
dry without water and invalidate your
guarantee.
The first operation of the shower is intended to
flush out any remaining system debris and to
ensure water is purged through the unit. This
operation must be carried out with the flexible
hose screwed to the shower outlet but
without
the sprayhead attached.
Ensure the outlet of the flexible hose is directed to
waste.
Ensure the gate valves controlling the water
supply to the unit are fully open.
(There is no need to fit cover at this stage but be
aware of live parts when the electricity is switched
on temporarily).
Fit the temperature control onto the adaptor
(fig.19)
. This is a push fit and will only fit one
way.
On the PCB, ensure the commissioning link is
positioned on the middle two pins
(fig.20)
.
Switch on electric supply at isolating switch. Water
will begin to flow under gravity pressure.
(Once the unit has been commissioned,
disconnect the electricity supply
before
removing
the commissioning link).
WARNING: Be aware of live parts in the unit
when the electricity is switched on.
DO NOT tamper with any parts and DO NOT
deviate from the following instructions.
In order to dispel air and to prime both supplies to
the shower unit, turn the temperature control
several times within its rotational limits. ONCE
RESISTANCE IS FELT, DO NOT FORCE THE
CONTROL FURTHER.
NOTE: The temperature control rotates less than
one complete turn
(fig.21)
– from
3 o’ clock (cold) anti-clockwise to 6 o’ clock
position (hot) and visa versa. DO NOT force it
beyond these limits.
To stop the water flow, switch off the electricity
supply at the isolating switch.
Check for leaks in the pipework and remedy if
Fig.19
Commissioning
link
Fig.20
Cold
Hot
Fig.21