Aspirante thermostatic power shower
13
Fig.19
Commissioning
link
Fig.20
DISCONNECT FROM
ELECTRICITY SUPPLY
BEFORE REMOVING
THIS COVER
Cold
Hot
Fig.21
COMMISSIONING
THE COVER MAY BE LEFT OFF INITIALLY ONLY
FOR COMMISSIONING.
The first operation of the shower is intended
to flush out any remaining system debris and
to make sure that water is purged through the
unit. This operation must be carried out with the
flexible hose screwed to the shower outlet but
without the showerhead attached.
Direct the outlet of the flexible hose to waste.
Check that the gate valves controlling the water
supply to the unit are fully open. (There is no
need to fit cover at this stage but be aware of
live parts when the electricity is switched on
temporarily).
Fit the temperature control onto the adaptor
(fig.19)
. This is a push fit and will only fit one
way.
On the PCB, make sure the commissioning link is
positioned on the middle two pins
(fig.20)
.
Switch on electric supply at isolating switch.
Water will begin to flow under gravity pressure.
In order to dispel air and to prime both supplies
to the shower unit, turn the temperature control
several times within its rotational limits.
ONCE RESISTANCE IS FELT, DO NOT FORCE THE
CONTROL FURTHER.
WARNING!
Before normal operation of the
shower, it is essential that the
commissioning and setup procedure
are correctly completed. Failure to
do so could cause the pump to run
dry without water and invalidate
your guarantee.
WARNING!
Be aware of live parts in the unit
when the electricity is switched on.
DO NOT tamper with any parts and
DO NOT deviate from the following
instructions.